IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0724 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $126 $210 Implemented
BS0091 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,778 $17,240 Not Implemented
BS0091 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,806 $39,830 Not Implemented
BS0091 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,201 $240 Not Implemented
BS0091 # 04 Y:2017 04 2017 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $24,685 $3,100 Not Implemented
LE0427 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,735 $1,000 Implemented
LE0427 # 02 Y:2017 02 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,286 $1,200 Implemented
LE0427 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,823 $14,438 Implemented
LE0427 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,621 $5,775 Implemented
LE0427 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $1,580 $3,500 Implemented
LE0427 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,186 $5,500 Not Implemented
MZ0219 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $2,119 $1,550 Implemented
MZ0219 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,578 $60,055 Implemented
MZ0219 # 03 Y:2017 03 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $403 $1,482 Implemented
MZ0219 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $472 $2,100 Not Implemented
MZ0219 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,034 $12,800 Implemented
MZ0219 # 06 Y:2017 06 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,504 $420 Implemented
MZ0219 # 07 Y:2017 07 2017 INSTALL COMMON HEADER ON COMPRESSORS $20,012 $10,400 Not Implemented
MZ0219 # 08 Y:2017 08 2017 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $4,320 $4,328 Implemented
SU0433 # 01 Y:2017 01 2017 ELIMINATE/REDUCE AN OPERATION $16,596 $1,821 Implemented
SU0433 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $12,137 $1,162 Implemented
SU0433 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $2,678 $1,464 Implemented
SU0433 # 04 Y:2017 04 2017 MINIMIZE WATER USAGE $22,841 $23,500 Not Implemented
SU0433 # 05 Y:2017 05 2017 REDUCE VENTILATION AIR $464 $489 Not Implemented
SU0433 # 06 Y:2017 06 2017 INSULATE FEEDWATER TANK $21 $26 Not Implemented