IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS0122 # 02 Y:2022 02 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $942 $300 Implemented
LS0122 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,436 $575 Implemented
LS0122 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46,495 $39,219 Implemented
LS0122 # 05 Y:2022 05 2022 USE OPTIMUM THICKNESS INSULATION $2,779 $6,297 Implemented
LS2209 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $1,858 $75 Not Implemented
LS2209 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,222 $5,575 Implemented
LS2209 # 03 Y:2022 03 2022 USE PHOTOCELL CONTROLS $3,323 $740 Not Implemented
LS2209 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $46,753 $646,020 Not Implemented
SF0581 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,942 $0 Not Implemented
SF0581 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $488 $0 Not Implemented
SF0581 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,255 $300 Not Implemented
SF0581 # 04 Y:2022 04 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $5,523 $1,537 Not Implemented
SF0581 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $7,711 $3,227 Not Implemented
SF0581 # 06 Y:2022 06 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,550 $1,334 Not Implemented
SF0581 # 07 Y:2022 07 2022 REPAIR AND ELIMINATE STEAM LEAKS $2,960 $2,345 Not Implemented
SF0581 # 08 Y:2022 08 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $202 $192 Not Implemented
SF0581 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,582 $23,946 Not Implemented
SF0581 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,991 $61,830 Not Implemented
TT0266 # 01 Y:2022 01 2022 LEVEL TWO – INSTALL CONTROL SYSTEM USING IIOT DEVICES WITH COMMUNICATION CAPABILITIES TO STORE DATA TO THE CLOUD $32,000 $3,900 Implemented
TT0266 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $11,120 $138,300 Not Implemented
TT0266 # 03 Y:2022 03 2022 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,496 $2,400 Implemented
TT0266 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,458 $6,147 Implemented
TT0266 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,049 $1,100 Implemented
AS0515 # 01 Y:2022 01 2022 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $125,792 $20,098 Implemented
AS0515 # 02 Y:2022 02 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $30,224 $146,764 Not Implemented