IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0243 # 05 Y:2006 05 2006 USE PHOTOCELL CONTROLS $538 $270 Implemented
LL0243 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $527 $30 Implemented
LL0243 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $509 $350 Implemented
LL0243 # 08 Y:2006 08 2006 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $135 $198 Not Implemented
LE0229 # 01 Y:2006 01 2006 REDESIGN PROCESS $80,430 $30,000 Not Implemented
LE0229 # 02 Y:2006 02 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $64,670 $27,200 Implemented
LE0229 # 03 Y:2006 03 2006 RECYCLE WASTE INK AND CLEANUP SOLVENT $36,000 $50,000 Implemented
LE0229 # 04 Y:2006 04 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $16,904 $34,000 Implemented
LE0229 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,981 $500 Implemented
LE0229 # 06 Y:2006 06 2006 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,898 $316 Not Implemented
LE0229 # 07 Y:2006 07 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,542 $2,100 Not Implemented
LE0229 # 08 Y:2006 08 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,528 $2,500 Not Implemented
LE0229 # 09 Y:2006 09 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,780 $1,000 Implemented
LE0229 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $5,318 $525 Not Implemented
LE0229 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $4,218 Not Implemented
SD0377 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,618 $0 Not Implemented
SD0377 # 02 Y:2006 02 2006 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $2,845 $0 Not Implemented
SD0377 # 03 Y:2006 03 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,914 $0 Not Implemented
SD0377 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $1,461 $384 Not Implemented
SD0377 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,088 $594 Not Implemented
SD0377 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $968 $0 Not Implemented
SD0377 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $771 $2,320 Not Implemented
SD0377 # 08 Y:2006 08 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $375 $688 Not Implemented
UM0297 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $8,060 $2,000 Not Implemented
UM0297 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $6,448 $9,089 Not Implemented