IAC logo
IAC Assessment: LL0243
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: LL0243
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisiana, Lafayette
Assessment Year 2006
Principal Product Fabricated parts
NAICS 332313 - Plate Work Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $50,000,000-$100,000,000
# of Employees 85
Plant Area (Sq.Ft.) 27,250
Annual Production 500,000 Pieces
Production Hrs. Annual 5,928
Location (State) LA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,958 1,243,750 kWh $0.06
Electricity Demand $35,123 4,652 kW-months/year $7.55
Electricity Fees $4,083 - $ -
TOTAL ENERGY COSTS $113,164
RECOMMENDED SAVINGS* $20,617 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,628
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$8,455
Cost:
$575
$6,133 103,147 - - $227 - $595 - $1,500 - $6,133
103,147
kWh
-
-
kW-months/year
$227
-
$
$595
-
$
$1,500
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$8,399
Cost:
$1,521
$8,099 136,211 - - $300 - - - - - $8,099
136,211
kWh
-
-
kW-months/year
$300
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,122
Cost:
$440
$1,082 18,196 - - $40 - - - - - $1,082
18,196
kWh
-
-
kW-months/year
$40
-
$
-
-
$
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$932
Cost:
$372
$635 10,677 $264 35 $33 - - - - - $635
10,677
kWh
$264
35
kW-months/year
$33
-
$
-
-
$
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$538
Cost:
$270
$519 8,728 - - $19 - - - - - $519
8,728
kWh
-
-
kW-months/year
$19
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$527
Cost:
$30
$508 8,542 - - $19 - - - - - $508
8,542
kWh
-
-
kW-months/year
$19
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$509
Cost:
$350
$198 3,329 - - $7 - $304 - - - $198
3,329
kWh
-
-
kW-months/year
$7
-
$
$304
-
$
-
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$135
Cost:
$198
$130 2,189 - - $5 - - - - - $130
2,189
kWh
-
-
kW-months/year
$5
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$20,617
Cost:
$3,756
$17,304 291,019 $264 35 $650 - $899 - $1,500 - $17,304
291,019
kWh
$264
35
kW-months/year
$650
-
$
$899
-
$
$1,500
-
$
TOTAL IMPLEMENTED Savings:
$3,628
Cost:
$1,462
$2,942 49,472 $264 35 $118 - $304 - - - $2,942
49,472
kWh
$264
35
kW-months/year
$118
-
$
$304
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes One-time Revenue or Avoided Cost