Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KG0063 # 11 Y:1996 | 11 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $557,549 | $5,000 | Not Implemented |
WI0269 # 01 Y:1996 | 01 | 1996 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $128,670 | $10,000 | Implemented |
WI0269 # 02 Y:1996 | 02 | 1996 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $22,707 | $0 | Not Implemented |
WI0269 # 03 Y:1996 | 03 | 1996 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $16,770 | $25,000 | Not Implemented |
WI0269 # 04 Y:1996 | 04 | 1996 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $14,920 | $22,000 | Implemented |
WI0269 # 05 Y:1996 | 05 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,044 | $17,980 | Implemented |
WI0269 # 06 Y:1996 | 06 | 1996 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $4,367 | $0 | Not Implemented |
WI0269 # 07 Y:1996 | 07 | 1996 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,269 | $0 | Implemented |
WI0269 # 08 Y:1996 | 08 | 1996 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,458 | $7,500 | Not Implemented |
WI0269 # 09 Y:1996 | 09 | 1996 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,973 | $6,000 | Not Implemented |
WI0269 # 10 Y:1996 | 10 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,653 | $180 | Implemented |
WI0269 # 11 Y:1996 | 11 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,692 | $825 | Implemented |
WI0269 # 12 Y:1996 | 12 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,014 | $2,526 | Not Implemented |
WI0269 # 13 Y:1996 | 13 | 1996 | TURN OFF EQUIPMENT WHEN NOT IN USE | $968 | $0 | Not Implemented |
WI0269 # 14 Y:1996 | 14 | 1996 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $525 | $0 | Not Implemented |
SF0091 # 01 Y:1996 | 01 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,684 | $11,906 | Not Implemented |
SF0091 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $913 | $3,000 | Implemented |
SF0091 # 03 Y:1996 | 03 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $221 | $281 | Implemented |
SF0091 # 04 Y:1996 | 04 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $0 | Implemented |
SF0091 # 05 Y:1996 | 05 | 1996 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,017 | $0 | Not Implemented |
AM0277 # 01 Y:1996 | 01 | 1996 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $351,900 | $70,000 | Not Implemented |
AM0277 # 02 Y:1996 | 02 | 1996 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $34,050 | $30,000 | Implemented |
AM0277 # 03 Y:1996 | 03 | 1996 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $28,650 | $180 | Implemented |
AM0277 # 04 Y:1996 | 04 | 1996 | OPTIMIZE PLANT POWER FACTOR | $22,800 | $25,000 | Not Implemented |
AM0277 # 05 Y:1996 | 05 | 1996 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,300 | $0 | Not Implemented |