IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0221 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,767 $0 Not Implemented
LL0221 # 03 Y:2005 03 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $726 $0 Not Implemented
LL0221 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $685 $250 Implemented
LL0221 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $645 $0 Not Implemented
LL0221 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $26 $0 Not Implemented
LL0221 # 07 Y:2005 07 2005 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $31,870 $800 Implemented
IC0097 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $700 Implemented
IC0097 # 02 Y:2005 02 2005 ISOLATE HOT OR COLD EQUIPMENT $1,426 $3,768 Not Implemented
IC0097 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,092 $41,838 Implemented
IC0097 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,151 $5,789 Not Implemented
IC0097 # 05 Y:2005 05 2005 USE OPTIMUM TEMPERATURE $163 $1,044 Not Implemented
MI0102 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $100,313 $40,224 Not Implemented
MI0102 # 02 Y:2005 02 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $66,212 $29,320 Not Implemented
MI0102 # 03 Y:2005 03 2005 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $23,325 $1,104 Not Implemented
MI0102 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,890 $162 Not Implemented
MI0102 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,049 $870 Not Implemented
UF0359 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,279 $0 Not Implemented
UF0359 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $839 $0 Not Implemented
UF0359 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $627 $0 Implemented
UF0359 # 04 Y:2005 04 2005 USE PHOTOCELL CONTROLS $448 $0 Implemented
UF0359 # 05 Y:2005 05 2005 CHANGE OPERATING CONDITIONS $15,046 $0 Implemented
UF0358 # 01 Y:2005 01 2005 INSTALL OCCUPANCY SENSORS $456 $503 Not Implemented
UF0358 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,300 $475 Implemented
UF0358 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,147 $0 Implemented
UF0358 # 04 Y:2005 04 2005 USE COMPRESSOR AIR FILTERS $2,203 $630 Implemented