IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0463 # 07 Y:2013 07 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $467 $200 Not Implemented
MI0235 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,472 $18,000 Not Implemented
MI0235 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $13,438 $1,800 Implemented
MI0235 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,094 $13,735 Implemented
MI0235 # 04 Y:2013 04 2013 HEAT WATER WITH EXHAUST HEAT $4,126 $14,000 Not Implemented
MI0235 # 05 Y:2013 05 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $5,349 $1,400 Implemented
MI0235 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,581 $1,660 Implemented
MI0235 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,562 $900 Implemented
MI0235 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,298 $80 Implemented
MI0235 # 09 Y:2013 09 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,188 $40 Implemented
MI0235 # 10 Y:2013 10 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $992 $2,520 Implemented
MI0235 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $942 $2,050 Not Implemented
MI0235 # 12 Y:2013 12 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $855 $660 Not Implemented
MI0235 # 13 Y:2013 13 2013 INSTALL SKYLIGHTS $704 $1,200 Not Implemented
MI0235 # 14 Y:2013 14 2013 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $648 $693 Implemented
UA0095 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,807 $4,500 Not Implemented
UA0095 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,789 $800 Not Implemented
UA0095 # 03 Y:2013 03 2013 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $18,583 $59,040 Not Implemented
UA0095 # 04 Y:2013 04 2013 DISCONNECT BALLASTS $573 $324 Not Implemented
UA0095 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $562 $1,759 Not Implemented
UA0094 # 01 Y:2013 01 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $52,762 $41,601 Implemented
UA0094 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,672 $4,500 Implemented
UA0094 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,165 $800 Implemented
UA0094 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,674 $4,500 Implemented
UA0094 # 05 Y:2013 05 2013 BURN WOOD BY-PRODUCTS FOR HEAT $290,469 $297,000 Not Implemented