Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,043
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0463 # 07 Y:2013 | 07 | 2013 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $467 | $200 | Not Implemented |
MI0235 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,472 | $18,000 | Not Implemented |
MI0235 # 02 Y:2013 | 02 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,438 | $1,800 | Implemented |
MI0235 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,094 | $13,735 | Implemented |
MI0235 # 04 Y:2013 | 04 | 2013 | HEAT WATER WITH EXHAUST HEAT | $4,126 | $14,000 | Not Implemented |
MI0235 # 05 Y:2013 | 05 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $5,349 | $1,400 | Implemented |
MI0235 # 06 Y:2013 | 06 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,581 | $1,660 | Implemented |
MI0235 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $2,562 | $900 | Implemented |
MI0235 # 08 Y:2013 | 08 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,298 | $80 | Implemented |
MI0235 # 09 Y:2013 | 09 | 2013 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,188 | $40 | Implemented |
MI0235 # 10 Y:2013 | 10 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $992 | $2,520 | Implemented |
MI0235 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $942 | $2,050 | Not Implemented |
MI0235 # 12 Y:2013 | 12 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $855 | $660 | Not Implemented |
MI0235 # 13 Y:2013 | 13 | 2013 | INSTALL SKYLIGHTS | $704 | $1,200 | Not Implemented |
MI0235 # 14 Y:2013 | 14 | 2013 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $648 | $693 | Implemented |
UA0095 # 01 Y:2013 | 01 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,807 | $4,500 | Not Implemented |
UA0095 # 02 Y:2013 | 02 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,789 | $800 | Not Implemented |
UA0095 # 03 Y:2013 | 03 | 2013 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $18,583 | $59,040 | Not Implemented |
UA0095 # 04 Y:2013 | 04 | 2013 | DISCONNECT BALLASTS | $573 | $324 | Not Implemented |
UA0095 # 05 Y:2013 | 05 | 2013 | INSTALL OCCUPANCY SENSORS | $562 | $1,759 | Not Implemented |
UA0094 # 01 Y:2013 | 01 | 2013 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $52,762 | $41,601 | Implemented |
UA0094 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,672 | $4,500 | Implemented |
UA0094 # 03 Y:2013 | 03 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,165 | $800 | Implemented |
UA0094 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,674 | $4,500 | Implemented |
UA0094 # 05 Y:2013 | 05 | 2013 | BURN WOOD BY-PRODUCTS FOR HEAT | $290,469 | $297,000 | Not Implemented |