IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0121 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $3,460 $3,210 Not Implemented
DL0121 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,200 $18,600 Not Implemented
DL0121 # 10 Y:2014 10 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $0 Not Implemented
OR0625 # 01 Y:2014 01 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $11,654 $1,000 Not Implemented
OR0625 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,751 $5,908 Not Implemented
OR0625 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,834 $800 Not Implemented
OR0625 # 04 Y:2014 04 2014 USE SOLAR HEAT TO MAKE ELECTRICTY $5,889 $72,131 Not Implemented
OR0625 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,528 $0 Not Implemented
OR0625 # 06 Y:2014 06 2014 REDUCE FLUID FLOW RATES $2,097 $5,600 Not Implemented
DL0121 # 01 Y:2014 01 2014 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $31,300 $0 Not Implemented
DL0121 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,700 $0 Not Implemented
DL0121 # 03 Y:2014 03 2014 AIR CONDITION ONLY SPACE NECESSARY $22,620 $750 Not Implemented
DL0121 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,400 $13,500 Not Implemented
SU0355 # 01 Y:2014 01 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $906 $0 Not Implemented
SU0355 # 02 Y:2014 02 2014 DISCONNECT BALLASTS $6,431 $1,560 Not Implemented
SU0355 # 03 Y:2014 03 2014 INSULATE FEEDWATER TANK $267 $52 Implemented
SU0355 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,150 $1,655 Implemented
SU0355 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,005 $4,400 Not Implemented
SU0355 # 06 Y:2014 06 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,014 $1,136 Not Implemented
SU0355 # 07 Y:2014 07 2014 ELIMINATE/REDUCE AN OPERATION $3,274 $2,400 Not Implemented
NC0505 # 01 Y:2014 01 2014 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $1,293 $200 Implemented
NC0505 # 02 Y:2014 02 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,010 $20,000 Not Implemented
NC0505 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $33,641 $67,830 Not Implemented
NC0505 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,186 $100 Implemented
NC0505 # 05 Y:2014 05 2014 UPGRADE CONTROLS ON COMPRESSORS $1,108 $100 Implemented