IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0439 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,510 $5,375 Not Implemented
SD0439 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,851 $8,326 Not Implemented
SD0439 # 05 Y:2011 05 2011 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $110,990 $185,200 Not Implemented
SD0439 # 06 Y:2011 06 2011 RECOVER WASTE HEAT FROM EQUIPMENT $163,156 $302,600 Not Implemented
SF0401 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,461 $0 Not Implemented
SF0401 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,739 $5,292 Not Implemented
SF0401 # 03 Y:2011 03 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,247 $790 Not Implemented
SF0401 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,009 $11,288 Not Implemented
SF0401 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,392 $2,205 Not Implemented
SF0401 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $443 $1,057 Not Implemented
SF0401 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,415 $25,369 Not Implemented
SF0401 # 08 Y:2011 08 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,621 $39,987 Not Implemented
SD0438 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,004 $300 Implemented
SD0438 # 02 Y:2011 02 2011 COVER OPEN TANKS $36,210 $16,850 Not Implemented
SD0438 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,445 $1,530 Not Implemented
SD0438 # 04 Y:2011 04 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $28,654 $53,450 Not Implemented
SD0438 # 05 Y:2011 05 2011 OPTIMIZE PLANT POWER FACTOR $12,712 $37,600 Implemented
SD0438 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $8,562 $25,530 Not Implemented
SD0436 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,198 $2,100 Implemented
SD0436 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,180 $2,000 Implemented
SD0436 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $7,888 $6,050 Implemented
SD0436 # 04 Y:2011 04 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,787 $1,535 Implemented
SD0436 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $26,197 $22,700 Not Implemented
SD0436 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $35,598 $52,274 Implemented
SD0436 # 07 Y:2011 07 2011 INCREASE AMOUNT OF CONDENSATE RETURNED $12,828 $20,000 Implemented