IAC logo
IAC Assessment: SF0427
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SF0427
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Francisco State University
Assessment Year 2013
Principal Product Lab Test Data
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2835 - Diagnostic Substances
Sales $50,000,000-$100,000,000
# of Employees 220
Plant Area (Sq.Ft.) 75,000
Annual Production 84,000 Units
Production Hrs. Annual 6,552
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $478,177 4,540,150 kWh $0.11
Electricity Demand $135,941 11,224 kW-months/year $12.11
Electricity Fees $7,745 - $ -
Natural Gas $148,037 20,865 MMBtu $7.09
TOTAL ENERGY COSTS $769,900
RECOMMENDED SAVINGS* $21,768 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,240
Cost:
$396
$1,632 15,541 $608 29 - - $1,632
15,541
kWh
$608
29
kW-months/year
-
-
MMBtu
02: 2.2123 INSULATE FEEDWATER TANK Savings:
$445
Cost:
$195
- - - - $445 63 -
-
kWh
-
-
kW-months/year
$445
63
MMBtu
03: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$1,742
Cost:
$1,330
- - - - $1,742 245 -
-
kWh
-
-
kW-months/year
$1,742
245
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,094
Cost:
$4,350
$2,094 19,946 - - - - $2,094
19,946
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,698
Cost:
$8,191
$2,698 25,697 - - - - $2,698
25,697
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,704
Cost:
$5,524
$2,395 22,811 - - $(-691) (-97) $2,395
22,811
kWh
-
-
kW-months/year
$(-691)
(-97)
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,106
Cost:
$17,609
$5,106 48,624 - - - - $5,106
48,624
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,429
Cost:
$17,469
$3,466 33,010 $963 46 - - $3,466
33,010
kWh
$963
46
kW-months/year
-
-
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,310
Cost:
$8,199
$1,201 11,439 $109 29 - - $1,201
11,439
kWh
$109
29
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$21,768
Cost:
$63,263
$18,592 177,068 $1,680 103 $1,496 211 $18,592
177,068
kWh
$1,680
103
kW-months/year
$1,496
211
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas