IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0171 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $737 $1,800 Not Implemented
WI0171 # 08 Y:1993 08 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $522 $375 Implemented
WI0171 # 09 Y:1993 09 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $346 $0 Implemented
CO0264 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,380 $650 Implemented
CO0264 # 02 Y:1993 02 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,310 $700 Not Implemented
CO0264 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $1,250 $1,300 Implemented
CO0264 # 04 Y:1993 04 1993 INSTALL TIMERS AND/OR THERMOSTATS $6,370 $5,550 Not Implemented
CO0264 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,350 $11,330 Implemented
CO0264 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,890 $2,770 Not Implemented
CO0264 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $250 $370 Not Implemented
CO0264 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,880 $55,200 Not Implemented
CO0264 # 09 Y:1993 09 1993 RECOVER WASTE HEAT FROM EQUIPMENT $5,030 $6,000 Not Implemented
CO0264 # 10 Y:1993 10 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $390 $1,120 Not Implemented
CO0264 # 11 Y:1993 11 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,530 $18,000 Not Implemented
TN0483 # 01 Y:1993 01 1993 INSULATE BARE EQUIPMENT $2,932 $175 Implemented
TN0483 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,478 $890 Not Implemented
TN0483 # 03 Y:1993 03 1993 USE SYNTHETIC LUBRICANT $2,347 $0 Not Implemented
TN0483 # 04 Y:1993 04 1993 REPAIR OR REPLACE STEAM TRAPS $680 $160 Not Implemented
TN0483 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,231 $790 Not Implemented
GT0490 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,080 $0 Implemented
GT0490 # 02 Y:1993 02 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,060 $9,600 Not Implemented
GT0490 # 03 Y:1993 03 1993 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $840 $0 Not Implemented
GT0490 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,740 $27,740 Implemented
GT0490 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,270 $0 Implemented
GT0490 # 06 Y:1993 06 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $620 $0 Implemented