IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0207 # 06 Y:2002 06 2002 INSTALL STORM WINDOWS AND DOORS $374 $1,000 Not Implemented
BD0207 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $311 $280 Not Implemented
BD0207 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $298 $400 Implemented
MA0509 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $21,321 $60,800 Not Implemented
MA0509 # 02 Y:2002 02 2002 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $18,790 $45,905 Implemented
MA0509 # 03 Y:2002 03 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,396 $0 Implemented
MA0509 # 04 Y:2002 04 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,396 $4,200 Implemented
MA0509 # 05 Y:2002 05 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,790 $1,200 Implemented
MA0509 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $439 $1,600 Implemented
MA0509 # 07 Y:2002 07 2002 INSTALL OCCUPANCY SENSORS $230 $608 Not Implemented
MA0509 # 08 Y:2002 08 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $161 $4,560 Not Implemented
MI0031 # 01 Y:2002 01 2002 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES $131,820 $30 Not Implemented
MI0031 # 02 Y:2002 02 2002 USE SCREENING, MAGNETIC SEPARATION TO REMOVE CONTAMINANTS $38,400 $10,372 Implemented
MI0031 # 03 Y:2002 03 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $30,176 $37,105 Not Implemented
MI0031 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,898 $1,820 Not Implemented
MI0031 # 05 Y:2002 05 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $18,813 $23,000 Implemented
MI0031 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,483 $1,137 Not Implemented
LE0131 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,624 $0 Implemented
LE0131 # 02 Y:2002 02 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,376 $4,500 Implemented
LE0131 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,486 $500 Not Implemented
LE0131 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $238 $0 Not Implemented
LE0131 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,937 $6,200 Not Implemented
LL0132 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $2,920 $947 Not Implemented
LL0132 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $981 $630 Not Implemented
LL0132 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $751 $780 Not Implemented