IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0084 # 03 Y:1993 03 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $331 $1,500 Not Implemented
AS0084 # 04 Y:1993 04 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,723 $0 Implemented
AS0084 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $240 $83 Implemented
AS0084 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,618 $1,900 Not Implemented
AS0084 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $1,285 $900 Not Implemented
AS0084 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $600 Not Implemented
AS0083 # 01 Y:1993 01 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,343 $1,000 Implemented
AS0083 # 02 Y:1993 02 1993 USE SYNTHETIC LUBRICANT $1,566 $0 Implemented
AS0083 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $592 $100 Implemented
AS0083 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $183 $550 Implemented
AS0083 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $511 $0 Implemented
AS0083 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $306 $198 Not Implemented
AS0083 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,718 $94 Not Implemented
AS0083 # 08 Y:1993 08 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,058 $5,250 Not Implemented
AS0083 # 09 Y:1993 09 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $746 $1,300 Not Implemented
AS0082 # 01 Y:1993 01 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $100,911 $482,500 Not Implemented
AS0082 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $270 $400 Implemented
AS0082 # 03 Y:1993 03 1993 REPAIR AND ELIMINATE STEAM LEAKS $186 $240 Implemented
AS0082 # 04 Y:1993 04 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $213 $300 Implemented
AS0082 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $469 $703 Implemented
AS0082 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $267 $0 Implemented
AS0082 # 07 Y:1993 07 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $1,635 $4,543 Implemented
AS0082 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $0 Implemented
AS0082 # 09 Y:1993 09 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $490 $500 Implemented
AS0081 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $230 $323 Implemented