IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DS0141 # 06 Y:1999 06 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,184 $1,200 Implemented
DS0141 # 07 Y:1999 07 1999 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $77,215 $0 Not Implemented
DS0141 # 08 Y:1999 08 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $6,612 $400 Not Implemented
DS0141 # 09 Y:1999 09 1999 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $3,240 $1,000 Not Implemented
DS0141 # 10 Y:1999 10 1999 INCREASE USE OF AUTOMATION $416,318 $440,000 Not Implemented
GT0660 # 01 Y:1999 01 1999 COMBINE UTILITY METERS $2,900 $0 Not Implemented
GT0660 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,800 $10,000 Not Implemented
GT0660 # 03 Y:1999 03 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $18,000 $500 Not Implemented
GT0660 # 04 Y:1999 04 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,000 $1,280 Not Implemented
GT0660 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,150 $1,000 Implemented
GT0660 # 06 Y:1999 06 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,900 $0 Implemented
GT0660 # 07 Y:1999 07 1999 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $416 $1,000 Not Implemented
GT0660 # 08 Y:1999 08 1999 MAINTAIN/ENLARGE A STOCK OF SPARE PARTS $161,575 $300,000 Implemented
CO0437 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,300 $7,500 Not Implemented
CO0437 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,280 $1,000 Not Implemented
CO0437 # 03 Y:1999 03 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,190 $2,720 Not Implemented
CO0437 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $958 Not Implemented
CO0437 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $790 $1,650 Not Implemented
CO0437 # 06 Y:1999 06 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $104,000 $1,500 Not Implemented
CO0437 # 07 Y:1999 07 1999 $59,470 $20,000 Not Implemented
DS0138 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,384 $998 Implemented
DS0138 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $242 $110 Not Implemented
DS0138 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $629 $875 Implemented
DS0138 # 04 Y:1999 04 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,273 $400 Not Implemented
DS0138 # 05 Y:1999 05 1999 UPGRADE CONTROLS ON COMPRESSORS $1,165 $241 Implemented