IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0348 # 01 Y:2000 01 2000 REPLACE BOILER $4,017 $10,000 Implemented
ND0348 # 02 Y:2000 02 2000 INSULATE BARE EQUIPMENT $271 $925 Implemented
ND0348 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,914 $3,344 Not Implemented
ND0348 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $268 $200 Implemented
ND0348 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $524 $385 Implemented
ND0348 # 06 Y:2000 06 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $433 $400 Implemented
ND0348 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $250,000 $40,000 Not Implemented
ND0348 # 08 Y:2000 08 2000 METER WASTE WATER $10,112 $250 Not Implemented
ND0348 # 09 Y:2000 09 2000 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $10,000 $200 Not Implemented
ND0346 # 01 Y:2000 01 2000 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $24,189 $150,000 Not Implemented
ND0346 # 02 Y:2000 02 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $7,277 $20,000 Not Implemented
ND0346 # 03 Y:2000 03 2000 DEVELOP A REPAIR/REPLACE POLICY $1,357 $20,552 Not Implemented
ND0346 # 04 Y:2000 04 2000 CHECK FOR ACCURACY OF UTILITY / POWER METERS $25,612 $500 Implemented
ND0346 # 05 Y:2000 05 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $12,004 $50 Implemented
ND0346 # 06 Y:2000 06 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $38,499 $40,000 Not Implemented
ND0346 # 07 Y:2000 07 2000 INSTALL TIMERS AND/OR THERMOSTATS $838 $1,125 Not Implemented
ND0346 # 08 Y:2000 08 2000 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $16,244 $61,500 Not Implemented
ND0346 # 09 Y:2000 09 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,454 $750 Implemented
ND0346 # 10 Y:2000 10 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $238 $60 Implemented
ND0346 # 11 Y:2000 11 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,834 $7,999 Not Implemented
ND0346 # 12 Y:2000 12 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,827 $320 Implemented
ND0346 # 13 Y:2000 13 2000 INSTALL OCCUPANCY SENSORS $330 $400 Not Implemented
ND0346 # 14 Y:2000 14 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $64 $10 Implemented
NV0151 # 01 Y:2000 01 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,327 $7,833 Implemented
NV0151 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $959 $500 Implemented