IAC logo
IAC Assessment: NV0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 2000
Principal Product Clay and Earthen Fillers
NAICS n/a
SIC 3255 - Clay Refractories
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 362,111
Annual Production 24,000 Tons
Production Hrs. Annual 3,430
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $49,856 824,736 kWh $0.06
Electricity Demand $27,257 3,936 kW-months/year $6.93
Electricity Fees $3,042 - $ -
Natural Gas $45,282 8,377 MMBtu $5.41
TOTAL ENERGY COSTS $132,254
RECOMMENDED SAVINGS* $32,068 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,056
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,327
Cost:
$7,833
$1,374 23,154 $889 117 $64 - - - - - - - $1,374
23,154
kWh
$889
117
kW-months/year
$64
-
$
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$959
Cost:
$500
$593 9,965 $341 45 $25 - - - - - - - $593
9,965
kWh
$341
45
kW-months/year
$25
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$171
Cost:
$63
$133 2,345 $33 4 $5 - - - - - - - $133
2,345
kWh
$33
4
kW-months/year
$5
-
$
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,656
Cost:
$5,920
$1,292 21,981 $320 42 $44 - - - - - - - $1,292
21,981
kWh
$320
42
kW-months/year
$44
-
$
-
-
MMBtu
-
-
lb
-
-
$
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$4,012
Cost:
$10,869
- - $2,502 367 $953 - $557 67 - - - - -
-
kWh
$2,502
367
kW-months/year
$953
-
$
$557
67
MMBtu
-
-
lb
-
-
$
06: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$21,000
Cost:
$78,000
- - - - - - - - - - $21,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$21,000
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,943
Cost:
$3,500
- - - - - - - - $1,943 13,163 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,943
13,163
lb
-
-
$
TOTAL RECOMMENDED Savings:
$32,068
Cost:
$106,685
$3,392 57,445 $4,085 575 $1,091 - $557 67 $1,943 13,163 $21,000 - $3,392
57,445
kWh
$4,085
575
kW-months/year
$1,091
-
$
$557
67
MMBtu
$1,943
13,163
lb
$21,000
-
$
TOTAL IMPLEMENTED Savings:
$28,056
Cost:
$95,816
$3,392 57,445 $1,583 208 $138 - - - $1,943 13,163 $21,000 - $3,392
57,445
kWh
$1,583
208
kW-months/year
$138
-
$
-
-
MMBtu
$1,943
13,163
lb
$21,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Personnel Changes