IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,767

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0329 # 01 Y:1988 01 1988 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $5,964 $19,684 Not Implemented
TN0329 # 02 Y:1988 02 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,471 $2,193 Implemented
TN0329 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,753 $615 Implemented
TN0329 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,619 $0 Implemented
TN0329 # 05 Y:1988 05 1988 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,783 $3,300 Implemented
TN0329 # 06 Y:1988 06 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,824 $1,180 Implemented
TN0329 # 07 Y:1988 07 1988 IMPROVE LUBRICATION PRACTICES $1,824 $0 Implemented
TN0329 # 08 Y:1988 08 1988 INSULATE BARE EQUIPMENT $1,151 $566 Not Implemented
TN0329 # 09 Y:1988 09 1988 INSULATE BARE EQUIPMENT $1,106 $146 Implemented
TN0329 # 10 Y:1988 10 1988 COVER OPEN TANKS $252 $0 Implemented
TN0329 # 11 Y:1988 11 1988 INSULATE BARE EQUIPMENT $196 $561 Not Implemented
TN0329 # 12 Y:1988 12 1988 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $179 $600 Implemented
TN0330 # 01 Y:1988 01 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,526 $7,320 Not Implemented
TN0330 # 02 Y:1988 02 1988 KEEP LAMPS AND REFLECTORS CLEAN $7,118 $15,836 Not Implemented
TN0330 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,699 $1,110 Not Implemented
TN0330 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $914 $0 Not Implemented
TN0330 # 06 Y:1988 06 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,252 $0 Not Implemented
TN0330 # 07 Y:1988 07 1988 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $233 $310 Not Implemented
TN0330 # 08 Y:1988 08 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $732 $0 Not Implemented
TN0330 # 09 Y:1988 09 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,872 $600 Not Implemented
TN0330 # 10 Y:1988 10 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $464 $355 Not Implemented
TN0330 # 11 Y:1988 11 1988 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $123 $50 Not Implemented
TN0331 # 01 Y:1988 01 1988 INSULATE BARE EQUIPMENT $4,805 $1,029 Implemented
TN0331 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $4,469 $3,650 Implemented
TN0331 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $4,263 $1,014 Implemented