IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0120 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $62,900 $38,400 Not Implemented
DL0120 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,777 $116,160 Implemented
DL0120 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,734 $9,000 Implemented
DL0120 # 04 Y:2014 04 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $176,850 $624,000 Not Implemented
DL0120 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $338,000 $400,000 Not Implemented
DL0120 # 06 Y:2014 06 2014 INSTALL AUTOMATIC STACK DAMPER $22,042 $16,000 Not Implemented
DL0120 # 07 Y:2014 07 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $44,085 $50,000 Not Implemented
DL0120 # 08 Y:2014 08 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $52,252 $500,000 Not Implemented
DL0120 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,260 $300 Implemented
DL0120 # 10 Y:2014 10 2014 REPAIR OR REPLACE STEAM TRAPS $1,770 $350 Implemented
UD0895 # 01 Y:2014 01 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $72,083 $0 Implemented
UD0895 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,208 $0 Implemented
UD0895 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $48,509 $7,500 Implemented
UD0895 # 04 Y:2014 04 2014 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,209 $0 Implemented
UD0895 # 05 Y:2014 05 2014 ADD AREA LIGHTING SWITCHES $1,613 $1,575 Implemented
UD0895 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $1,252 $2,900 Not Implemented
UD0895 # 07 Y:2014 07 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $249 $510 Implemented
UD0895 # 08 Y:2014 08 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,823 $16,000 Implemented
UD0895 # 09 Y:2014 09 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,388 $800 Implemented
UD0895 # 10 Y:2014 10 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,520 $4,275 Implemented
IA0514 # 01 Y:2014 01 2014 DIRECT WARMEST AIR TO COMBUSTION INTAKE $18,117 $82,200 Not Implemented
IA0514 # 02 Y:2014 02 2014 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,046 $55,230 Not Implemented
IA0514 # 03 Y:2014 03 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,061 $1,012 Not Implemented
IA0514 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $140 Implemented
IA0514 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $665 $35 Not Implemented