IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,880

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0640 # 07 Y:2023 07 2023 DEVELOP A REPAIR/REPLACE POLICY $3,201 $1,563 Implemented
WV0640 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,011 $596 Implemented
WV0640 # 09 Y:2023 09 2023 UPGRADE CONTROLS ON COMPRESSORS $2,907 $11,135 Not Implemented
WV0640 # 10 Y:2023 10 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,582 $5,558 Implemented
WV0640 # 11 Y:2023 11 2023 INSULATE BARE EQUIPMENT $930 $135 Implemented
WV0640 # 12 Y:2023 12 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $66 $178 Implemented
UC2303 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $284 $500 Not Implemented
UC2303 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $115 $696 Not Implemented
UC2303 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $2,800 Not Implemented
UC2303 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,129 $500 Not Implemented
UC2303 # 05 Y:2023 05 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $16,066 $176,604 Not Implemented
UC2303 # 06 Y:2023 06 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,257 $36,220 Not Implemented
UC2303 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $47,312 $455,896 Not Implemented
UC2303 # 08 Y:2023 08 2023 USE HEAT PUMP FOR SPACE CONDITIONING $3,229 $13,224 Not Implemented
UC2303 # 09 Y:2023 09 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $11,455 $55,867 Not Implemented
UF0592 # 01 Y:2023 01 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $73,113 $215,600 Not Implemented
UF0592 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $56,023 $88,370 Implemented
UF0592 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $30,274 $30,607 Implemented
UF0592 # 04 Y:2023 04 2023 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,287 $18,600 Implemented
UF0592 # 05 Y:2023 05 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $9,922 $11,796 Implemented
UF0592 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,412 $25,400 Not Implemented
UF0592 # 07 Y:2023 07 2023 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,981 $508 Implemented
UF0592 # 08 Y:2023 08 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $1,672 $1,200 Implemented
UF0592 # 09 Y:2023 09 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,580 $600 Implemented
UF0592 # 10 Y:2023 10 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $62,417 $10,000 Implemented