Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0255 # 03 Y:2018 | 03 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $10,288 | $1,000 | Implemented |
MZ0255 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,910 | $1,540 | Implemented |
MZ0255 # 05 Y:2018 | 05 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,457 | $3,200 | Not Implemented |
MZ0255 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,260 | $100 | Not Implemented |
MZ0255 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $1,086 | $280 | Implemented |
MZ0255 # 08 Y:2018 | 08 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $938 | $225 | Implemented |
OK0986 # 01 Y:2018 | 01 | 2018 | REPAIR AND ELIMINATE STEAM LEAKS | $107,913 | $4,800 | Implemented |
OK0986 # 02 Y:2018 | 02 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $28,456 | $4,000 | Implemented |
OK0986 # 03 Y:2018 | 03 | 2018 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $698 | $356 | Not Implemented |
OK0986 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,941 | $16,934 | Implemented |
OK0986 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $552 | $1,402 | Implemented |
OK0986 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $893 | $6,038 | Implemented |
OK0986 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,208 | $4,556 | Implemented |
OK0986 # 08 Y:2018 | 08 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,819 | $4,198 | Implemented |
OK0986 # 09 Y:2018 | 09 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,714 | $381 | Not Implemented |
OK0986 # 10 Y:2018 | 10 | 2018 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $546 | $1,200 | Not Implemented |
OK0986 # 11 Y:2018 | 11 | 2018 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $357 | $183 | Not Implemented |
OK0986 # 12 Y:2018 | 12 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $99,065 | $85,003 | Implemented |
OK0986 # 13 Y:2018 | 13 | 2018 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $634,282 | $3,891,600 | Not Implemented |
MZ0247 # 01 Y:2018 | 01 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $29,241 | $3,340 | Not Implemented |
MZ0247 # 02 Y:2018 | 02 | 2018 | OPTIMIZE PLANT POWER FACTOR | $13,764 | $10,000 | Not Implemented |
MZ0247 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $6,231 | $2,346 | Implemented |
MZ0247 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,430 | $4,900 | Implemented |
MZ0247 # 05 Y:2018 | 05 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,573 | $500 | Not Implemented |
MZ0247 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,053 | $170 | Not Implemented |