IAC logo
IAC Assessment: OK0996
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0996
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2018
Principal Product Structural Aircraft Parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 200,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $168,470 3,973,028 kWh $0.04
Electricity Demand $168,361 7,908 kW-months/year $21.29
Natural Gas $13,936 1,973 MMBtu $7.06
TOTAL ENERGY COSTS $350,767
RECOMMENDED SAVINGS* $84,947 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,265
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,265
Cost:
$25,906
$20,172 480,289 $12,093 568 $20,172
480,289
kWh
$12,093
568
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$18,485
Cost:
$22,966
$18,485 440,126 - - $18,485
440,126
kWh
-
-
kW-months/year
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,799
Cost:
$9,162
- - $18,799 883 -
-
kWh
$18,799
883
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,536
Cost:
$2,095
$8,536 203,232 - - $8,536
203,232
kWh
-
-
kW-months/year
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,396
Cost:
-
$2,396 57,038 - - $2,396
57,038
kWh
-
-
kW-months/year
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,466
Cost:
$610
$2,635 62,746 $1,831 86 $2,635
62,746
kWh
$1,831
86
kW-months/year
TOTAL RECOMMENDED Savings:
$84,947
Cost:
$60,739
$52,224 1,243,431 $32,723 1,537 $52,224
1,243,431
kWh
$32,723
1,537
kW-months/year
TOTAL IMPLEMENTED Savings:
$32,265
Cost:
$25,906
$20,172 480,289 $12,093 568 $20,172
480,289
kWh
$12,093
568
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand