Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,883
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0624 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,280 | $0 | n/a |
UF0624 # 06 Y:2024 | 06 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,844 | $6,000 | n/a |
UF0624 # 07 Y:2024 | 07 | 2024 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $38,400 | $100,000 | n/a |
UF0624 # 08 Y:2024 | 08 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $23,221 | $60,000 | n/a |
LT8417 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $393 | $0 | n/a |
LT8417 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,056 | $0 | n/a |
LT8417 # 03 Y:2024 | 03 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $18,894 | $485,500 | n/a |
LT8417 # 04 Y:2024 | 04 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,666 | $39,130 | n/a |
CI0038 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,768 | $242,254 | n/a |
CI0038 # 02 Y:2024 | 02 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $28,800 | $10,000 | n/a |
CI0038 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,400 | $1,000 | n/a |
CI0038 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $8,867 | $17,866 | n/a |
CI0038 # 05 Y:2024 | 05 | 2024 | USE PHOTOCELL CONTROLS | $4,714 | $1,500 | n/a |
CI0038 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,690 | $1,100 | n/a |
CI0038 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,786 | $792 | n/a |
CI0038 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $765 | $3,000 | n/a |
CI0038 # 09 Y:2024 | 09 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $577 | $150 | n/a |
IP0202 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $695 | $21 | n/a |
IP0202 # 02 Y:2024 | 02 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,291 | $0 | n/a |
IP0202 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $28,335 | $0 | n/a |
IP0202 # 04 Y:2024 | 04 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,000 | $0 | n/a |
IP0202 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $18,233 | $827 | n/a |
IP0202 # 06 Y:2024 | 06 | 2024 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $7,924 | $1,309 | n/a |
IP0202 # 07 Y:2024 | 07 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $21,856 | $5,952 | n/a |
IP0202 # 08 Y:2024 | 08 | 2024 | USE CONTINUOUS EQUIPMENT WHICH RETAINS PROCESS HEATING CONVEYORS WITHIN THE HEATED CHAMBER | $99,783 | $28,120 | n/a |