IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0248 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,390 $9,688 n/a
MS0248 # 04 Y:2004 04 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,247 $4,074 n/a
MS0248 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,960 $8,090 n/a
MS0248 # 06 Y:2004 06 2004 BURN WASTE OIL FOR HEAT $2,232 $2,190 n/a
MS0248 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,777 $228 n/a
MS0248 # 08 Y:2004 08 2004 $740 $25 n/a
MS0248 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $560 $1,033 n/a
MS0247 # 01 Y:2004 01 2004 USE RADIANT HEATER FOR SPOT HEATING $11,681 $14,325 n/a
MS0247 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,013 $5,320 n/a
MS0247 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,671 $25 n/a
MS0247 # 04 Y:2004 04 2004 BURN WASTE OIL FOR HEAT $2,499 $1,974 n/a
MS0247 # 05 Y:2004 05 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,874 $1,218 n/a
MS0247 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,736 $158 n/a
MS0247 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,050 $1,558 n/a
MS0247 # 08 Y:2004 08 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $668 $178 n/a
MS0247 # 09 Y:2004 09 2004 DISCONNECT BALLASTS $339 $564 n/a
AM0458 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $7,070 $15,675 Implemented
AM0458 # 02 Y:2004 02 2004 $2,620 $0 Implemented
AM0458 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,810 $500 Implemented
AM0458 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $1,600 $960 Implemented
AM0458 # 05 Y:2004 05 2004 REDUCE GLAZED AREAS IN BUILDINGS $1,100 $255 Not Implemented
AM0458 # 06 Y:2004 06 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $880 $0 Implemented
AM0458 # 07 Y:2004 07 2004 METER WASTE WATER $530 $0 Not Implemented
AM0458 # 08 Y:2004 08 2004 USE SYNTHETIC LUBRICANT $450 $0 Implemented
AM0458 # 09 Y:2004 09 2004 INSTALL OCCUPANCY SENSORS $200 $200 Not Implemented