IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0437 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $849 $276 Not Implemented
OK0437 # 08 Y:1994 08 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $519 $0 Not Implemented
OK0437 # 09 Y:1994 09 1994 INSTALL SET-BACK TIMERS $155 $162 Not Implemented
OK0440 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $22,747 $25,415 Implemented
OK0440 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,382 $0 Implemented
OK0440 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,930 $16,704 Implemented
OK0440 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,522 $5,878 Implemented
OK0440 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,037 $700 Implemented
OK0440 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $368 $0 Implemented
OK0440 # 07 Y:1994 07 1994 INSULATE BARE EQUIPMENT $214 $258 Implemented
TN0518 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,334 $1,000 Implemented
TN0518 # 02 Y:1994 02 1994 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $10,859 $13,300 Not Implemented
TN0518 # 03 Y:1994 03 1994 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $11,508 $5,200 Not Implemented
TN0518 # 04 Y:1994 04 1994 INSTALL TIMERS AND/OR THERMOSTATS $7,597 $5,400 Not Implemented
TN0518 # 05 Y:1994 05 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,005 $360 Not Implemented
TN0518 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $6,176 $605 Not Implemented
TN0518 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,013 $200 Implemented
TN0518 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $108 Implemented
TN0519 # 01 Y:1994 01 1994 USE MINIMUM STEAM OPERATING PRESSURE $12,830 $0 Not Implemented
TN0519 # 02 Y:1994 02 1994 INSTALL TIMERS AND/OR THERMOSTATS $2,780 $2,100 Not Implemented
TN0519 # 03 Y:1994 03 1994 USE SYNTHETIC LUBRICANT $2,004 $0 Not Implemented
TN0519 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,588 $1,170 Not Implemented
AS0116 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,465 $81,258 Implemented
AS0116 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $4,022 $2,265 Implemented
AS0116 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,572 $18,827 Implemented