IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0245 # 07 Y:2000 07 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $515 $0 Implemented
SD0245 # 08 Y:2000 08 2000 INSTALL BACK-UP EQUIPMENT $6,118 $7,000 Not Implemented
MA0463 # 01 Y:2000 01 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $203,441 $1,320,000 Not Implemented
MA0463 # 02 Y:2000 02 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,420 $120,000 Implemented
MA0463 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,123 $12,075 Not Implemented
MA0463 # 04 Y:2000 04 2000 OPTIMIZE PLANT POWER FACTOR $3,291 $9,600 Not Implemented
MA0463 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,745 $4,317 Implemented
MA0463 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $420 Implemented
IA0241 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,172 $1,104 Implemented
IA0241 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,055 $0 Implemented
IA0241 # 03 Y:2000 03 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,987 $2,000 Not Implemented
IA0241 # 04 Y:2000 04 2000 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,474 $1,474 Not Implemented
IA0241 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,325 $39,789 Implemented
IA0241 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,574 $0 Not Implemented
IA0241 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $213 $466 Not Implemented
IA0241 # 08 Y:2000 08 2000 DISTILL CONTAMINATED SOLVENTS FOR REUSE $94,641 $36,700 Not Implemented
IA0241 # 09 Y:2000 09 2000 PURCHASE EQUIPMENT INSTEAD OF LEASING $2,750 $7,900 Not Implemented
IA0241 # 10 Y:2000 10 2000 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $34,515 $2,950 Not Implemented
IA0241 # 11 Y:2000 11 2000 COMBINE UTILITY METERS $5,863 $100 Not Implemented
GT0686 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $74,340 $0 Implemented
GT0686 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,980 $0 Not Implemented
GT0686 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,607 $700 Implemented
GT0686 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $1,400 $500 Implemented
GT0686 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $1,280 $1,105 Implemented
GT0686 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $4,025 $9,895 Not Implemented