IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0840 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,413 $1,378 Not Implemented
OK0840 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,327 $0 Implemented
OK0840 # 05 Y:2013 05 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $360 $1,575 Implemented
OK0840 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $673 $8,267 Not Implemented
OK0840 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,885 $7,053 Not Implemented
OK0840 # 08 Y:2013 08 2013 REPLACE BOILER $6,063 $60,000 Not Implemented
OK0840 # 09 Y:2013 09 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,770 $21,632 Not Implemented
OK0840 # 10 Y:2013 10 2013 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,310 $4,958 Implemented
OK0840 # 11 Y:2013 11 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,220 $3,650 Not Implemented
OK0840 # 12 Y:2013 12 2013 INSTALL SET-BACK TIMERS $2,987 $2,259 Implemented
OK0840 # 13 Y:2013 13 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,448 $0 Implemented
OK0840 # 14 Y:2013 14 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,826 $25,000 Implemented
OK0840 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,788 $27,500 Not Implemented
UA0092 # 01 Y:2013 01 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $187,982 $150,000 Not Implemented
UA0092 # 02 Y:2013 02 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $37,964 $77,760 Not Implemented
UA0092 # 03 Y:2013 03 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $25,845 $25,121 Implemented
UA0092 # 04 Y:2013 04 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $62,047 $15,800 Not Implemented
UA0092 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,460 $6,200 Implemented
UA0092 # 06 Y:2013 06 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,421 $135 Implemented
SU0332 # 01 Y:2013 01 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $72,807 $28,851 Not Implemented
SU0332 # 02 Y:2013 02 2013 ELIMINATE/REDUCE AN OPERATION $12,570 $7,200 Not Implemented
SU0332 # 03 Y:2013 03 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,121 $10,392 Not Implemented
SU0332 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,766 $1,320 Implemented
SU0332 # 05 Y:2013 05 2013 UPGRADE OBSOLETE EQUIPMENT $1,180 $5,512 Not Implemented
SU0332 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,516 $37,508 Not Implemented