Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2013 |
Principal Product | Carbinated beverages |
NAICS | 312111 - Soft Drink Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $5,000,000-$10,000,000 |
# of Employees | 125 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 7,000,000 Units |
Production Hrs. Annual | 2,600 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $275,164 | 3,633,887 | kWh | $0.08 |
Natural Gas | $37,106 | 8,691 | MMBtu | $4.27 |
TOTAL ENERGY COSTS | $312,270 | |||
RECOMMENDED SAVINGS* | $50,143 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,331 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,788 Cost: $27,500 |
$3,788 | 49,838 | - | - |
$3,788 49,838 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,073 Cost: $600 |
$2,073 | 27,276 | - | - |
$2,073 27,276 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,413 Cost: $1,378 |
- | - | $1,413 | 330 |
- - kWh |
$1,413 330 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,327 Cost: - |
$1,327 | 17,456 | - | - |
$1,327 17,456 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $360 Cost: $1,575 |
$360 | 4,731 | - | - |
$360 4,731 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $673 Cost: $8,267 |
$673 | 8,850 | - | - |
$673 8,850 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,885 Cost: $7,053 |
$1,885 | 24,480 | - | - |
$1,885 24,480 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1224 REPLACE BOILER |
Savings: $6,063 Cost: $60,000 |
- | - | $6,063 | 1,420 |
- - kWh |
$6,063 1,420 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $5,770 Cost: $21,632 |
$5,770 | 75,923 | - | - |
$5,770 75,923 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $1,310 Cost: $4,958 |
$1,310 | 16,374 | - | - |
$1,310 16,374 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $3,220 Cost: $3,650 |
$3,220 | 42,360 | - | - |
$3,220 42,360 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $2,987 Cost: $2,259 |
$1,884 | 24,789 | $1,103 | 258 |
$1,884 24,789 kWh |
$1,103 258 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $4,448 Cost: - |
$4,448 | 58,522 | - | - |
$4,448 58,522 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $14,826 Cost: $25,000 |
$14,826 | 195,075 | - | - |
$14,826 195,075 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $50,143 Cost: $163,872 |
$41,564 | 545,674 | $8,579 | 2,008 | $41,564 545,674 kWh |
$8,579 2,008 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,331 Cost: $34,392 |
$26,228 | 344,223 | $1,103 | 258 | $26,228 344,223 kWh |
$1,103 258 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |