Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,880
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CI0007 # 04 Y:2023 | 04 | 2023 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,248 | $4,500 | Not Implemented |
CI0007 # 05 Y:2023 | 05 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,887 | $50 | Not Implemented |
CI0007 # 06 Y:2023 | 06 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,123 | $836 | Not Implemented |
CI0007 # 07 Y:2023 | 07 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $853 | $0 | Not Implemented |
CI0007 # 08 Y:2023 | 08 | 2023 | SCHEDULE USE OF ELEVATORS TO CONSERVE ENERGY | $663 | $0 | Not Implemented |
ORC007 # 01 Y:2023 | 01 | 2023 | INSTALL OCCUPANCY SENSORS | $765 | $5,150 | Not Implemented |
ORC007 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,853 | $26,400 | Not Implemented |
ORC007 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $3,082 | $200 | Implemented |
ORC007 # 04 Y:2023 | 04 | 2023 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $808 | $50 | Implemented |
ORC007 # 05 Y:2023 | 05 | 2023 | CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES | $2,696 | $200 | Implemented |
ORC007 # 06 Y:2023 | 06 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $535 | $5,000 | Not Implemented |
ORC007 # 07 Y:2023 | 07 | 2023 | REPLACE BOILER | $3,485 | $30,000 | Not Implemented |
SD0631 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,583 | $10,494 | Not Implemented |
SD0631 # 02 Y:2023 | 02 | 2023 | USE BATTERY STORAGE FOR DEMAND CONTROL | $15,108 | $70,650 | Not Implemented |
SD0631 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $754 | $1,124 | Implemented |
SD0631 # 04 Y:2023 | 04 | 2023 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $3,553 | $3,535 | Not Implemented |
SD0631 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,208 | $16,000 | Not Implemented |
SD0631 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $928 | $2,934 | Not Implemented |
SD0631 # 07 Y:2023 | 07 | 2023 | INSULATE BARE EQUIPMENT | $1,509 | $4,973 | Not Implemented |
SD0631 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,593 | $4,339 | Not Implemented |
WV0639 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,281,087 | $1,151,450 | Not Implemented |
WV0639 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $76,363 | $381,250 | Not Implemented |
WV0639 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,872 | $1,250 | Implemented |
WV0639 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $17,944 | $36,920 | Not Implemented |
WV0639 # 05 Y:2023 | 05 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $11,555 | $2,233 | Implemented |