Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0459 # 11 Y:2015 | 11 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $17,754 | $22,786 | Implemented |
SF0459 # 12 Y:2015 | 12 | 2015 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $58,197 | $81,522 | Implemented |
SF0459 # 13 Y:2015 | 13 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,158 | $24,030 | Implemented |
SF0459 # 14 Y:2015 | 14 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $42,975 | $82,916 | Implemented |
SF0459 # 15 Y:2015 | 15 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,707 | $39,862 | Not Implemented |
SF0459 # 16 Y:2015 | 16 | 2015 | INSTALL OCCUPANCY SENSORS | $6,651 | $23,688 | Not Implemented |
SF0459 # 17 Y:2015 | 17 | 2015 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $166,472 | $100,519 | Implemented |
SF0459 # 18 Y:2015 | 18 | 2015 | USE POWER DURING OFF-PEAK PERIODS | $5,106 | $0 | Not Implemented |
OK0903 # 01 Y:2015 | 01 | 2015 | INSTALL SET-BACK TIMERS | $28,117 | $86 | Not Implemented |
OK0903 # 02 Y:2015 | 02 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $96,611 | $20,611 | Implemented |
OK0903 # 03 Y:2015 | 03 | 2015 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $3,411 | $228 | Implemented |
OK0903 # 04 Y:2015 | 04 | 2015 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,633 | $30,000 | Implemented |
OK0903 # 05 Y:2015 | 05 | 2015 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $407 | $1,125 | Not Implemented |
OK0903 # 06 Y:2015 | 06 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,717 | $11,876 | Not Implemented |
OK0903 # 07 Y:2015 | 07 | 2015 | INSTALL OCCUPANCY SENSORS | $2,170 | $8,887 | Not Implemented |
OK0903 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,490 | $2,440 | Not Implemented |
OK0903 # 09 Y:2015 | 09 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,183 | $950 | Implemented |
OK0903 # 10 Y:2015 | 10 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,904 | $10,062 | Implemented |
OK0903 # 11 Y:2015 | 11 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,427 | $2,112 | Not Implemented |
OK0903 # 12 Y:2015 | 12 | 2015 | INSULATE BARE EQUIPMENT | $195 | $240 | Not Implemented |
MI0272 # 01 Y:2015 | 01 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $108,119 | $1,400 | Not Implemented |
MI0272 # 02 Y:2015 | 02 | 2015 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $59,120 | $60,000 | Not Implemented |
MI0272 # 03 Y:2015 | 03 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,227 | $27,707 | Implemented |
MI0272 # 04 Y:2015 | 04 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,994 | $80 | Not Implemented |
MI0272 # 05 Y:2015 | 05 | 2015 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,265 | $11,000 | Not Implemented |