Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,032
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0045 # 06 Y:1982 | 06 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $461 | $100 | Not Implemented |
KU0045 # 07 Y:1982 | 07 | 1982 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $547 | $0 | Implemented |
KU0045 # 08 Y:1982 | 08 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $417 | $0 | Implemented |
KU0038 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,385 | $2,427 | Not Implemented |
KU0038 # 02 Y:1982 | 02 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $810 | $335 | Not Implemented |
KU0038 # 03 Y:1982 | 03 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $495 | $0 | Not Implemented |
KU0038 # 04 Y:1982 | 04 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $300 | $400 | Not Implemented |
KU0038 # 05 Y:1982 | 05 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $190 | $200 | Not Implemented |
KU0039 # 01 Y:1982 | 01 | 1982 | REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS | $26,510 | $35,000 | Not Implemented |
KU0039 # 02 Y:1982 | 02 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $18,206 | $7,700 | Not Implemented |
KU0039 # 03 Y:1982 | 03 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,081 | $2,129 | Not Implemented |
KU0039 # 04 Y:1982 | 04 | 1982 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,511 | $3,000 | Not Implemented |
KU0039 # 05 Y:1982 | 05 | 1982 | INCREASE EFFICIENCY OF TRUCKS | $9,000 | $0 | Not Implemented |
KU0039 # 06 Y:1982 | 06 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,569 | $25,000 | Not Implemented |
KU0039 # 07 Y:1982 | 07 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $6,940 | $100 | Not Implemented |
KU0040 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,624 | $6,466 | Not Implemented |
KU0040 # 02 Y:1982 | 02 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,812 | $12,000 | Not Implemented |
KU0040 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $118 | $180 | Not Implemented |
KU0040 # 04 Y:1982 | 04 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $332 | $0 | Not Implemented |
KU0040 # 05 Y:1982 | 05 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,235 | $1,050 | Not Implemented |
KU0034 # 01 Y:1982 | 01 | 1982 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $6,130 | $6,000 | Not Implemented |
KU0034 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,770 | $3,635 | Not Implemented |
KU0034 # 03 Y:1982 | 03 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,680 | $0 | Not Implemented |
KU0034 # 04 Y:1982 | 04 | 1982 | OPTIMIZE PLANT POWER FACTOR | $1,240 | $1,600 | Not Implemented |
KU0034 # 05 Y:1982 | 05 | 1982 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $450 | $869 | Not Implemented |