IAC logo
IAC Assessment: KU0043
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: KU0043
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1982
Principal Product PLASTIC BOTTLES
NAICS n/a
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 13,800,000 Pounds
Production Hrs. Annual 6,077
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $753,766 15,089,684 kWh $0.05
Natural Gas $36,216 12,598 MMBtu $2.87
TOTAL ENERGY COSTS $789,982
RECOMMENDED SAVINGS* $210,078 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,438
Cost:
$2,000
$10,438 208,968 - - $10,438
208,968
kWh
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,890
Cost:
$4,800
$2,804 56,272 $2,086 727 $2,804
56,272
kWh
$2,086
727
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,989
Cost:
$550
$8,989 179,953 - - $8,989
179,953
kWh
-
-
MMBtu
04: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$162,065
Cost:
$20,000
$162,065 3,244,431 - - $162,065
3,244,431
kWh
-
-
MMBtu
05: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$20,364
Cost:
$40,000
$20,364 407,679 - - $20,364
407,679
kWh
-
-
MMBtu
06: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$3,332
Cost:
$818
- - $3,332 1,162 -
-
kWh
$3,332
1,162
MMBtu
TOTAL RECOMMENDED Savings:
$210,078
Cost:
$68,168
$204,660 4,097,303 $5,418 1,889 $204,660
4,097,303
kWh
$5,418
1,889
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas