IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0271 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,939 $1,660 Not Implemented
MI0271 # 06 Y:2015 06 2015 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $4,265 $11,000 Implemented
MI0271 # 07 Y:2015 07 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,527 $6,000 Not Implemented
MI0271 # 08 Y:2015 08 2015 USE PHOTOCELL CONTROLS $2,361 $1,080 Not Implemented
MI0271 # 09 Y:2015 09 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,647 $80 Not Implemented
MI0271 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,369 $4,590 Implemented
MI0271 # 11 Y:2015 11 2015 INSTALL OCCUPANCY SENSORS $956 $373 Implemented
DL0139 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,375 $19,745 Not Implemented
DL0139 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $11,510 $2,330 Not Implemented
DL0139 # 03 Y:2015 03 2015 USE HEAT PUMP FOR SPACE CONDITIONING $4,240 $9,280 Not Implemented
DL0139 # 04 Y:2015 04 2015 REDUCE VENTILATION AIR $850 $0 Not Implemented
DL0139 # 05 Y:2015 05 2015 INSTALL TIMERS AND/OR THERMOSTATS $6,100 $710 Not Implemented
DL0139 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,120 $0 Not Implemented
DL0139 # 07 Y:2015 07 2015 INSTALL TIMERS AND/OR THERMOSTATS $320 $710 Not Implemented
DL0139 # 08 Y:2015 08 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $320 $90 Not Implemented
DL0139 # 09 Y:2015 09 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $810 $700 Not Implemented
DL0139 # 10 Y:2015 10 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,040 $22,500 Not Implemented
MA0742 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $55,652 $120,000 Not Implemented
MA0742 # 02 Y:2015 02 2015 OPTIMIZE PLANT POWER FACTOR $38,357 $25,972 Implemented
MA0742 # 03 Y:2015 03 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $24,583 $5,560 Implemented
MA0742 # 04 Y:2015 04 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $9,330 $1,000 Not Implemented
MA0742 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,116 $9,000 Implemented
MA0742 # 06 Y:2015 06 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,465 $11,685 Implemented
MA0742 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,112 $4,285 Not Implemented
MA0742 # 08 Y:2015 08 2015 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,024 $11,650 Implemented