Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0139 # 05 Y:2015 | 05 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $6,100 | $710 | Not Implemented |
DL0139 # 06 Y:2015 | 06 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,120 | $0 | Not Implemented |
DL0139 # 07 Y:2015 | 07 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $320 | $710 | Not Implemented |
DL0139 # 08 Y:2015 | 08 | 2015 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $320 | $90 | Not Implemented |
DL0139 # 09 Y:2015 | 09 | 2015 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $810 | $700 | Not Implemented |
DL0139 # 10 Y:2015 | 10 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,040 | $22,500 | Not Implemented |
MI0271 # 01 Y:2015 | 01 | 2015 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $49,400 | $1,400 | Not Implemented |
MI0271 # 02 Y:2015 | 02 | 2015 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $32,947 | $40,065 | Not Implemented |
MI0271 # 03 Y:2015 | 03 | 2015 | MINIMIZE WATER USAGE | $15,193 | $16,600 | Implemented |
MI0271 # 04 Y:2015 | 04 | 2015 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,862 | $3,960 | Not Implemented |
MI0271 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,939 | $1,660 | Not Implemented |
MI0271 # 06 Y:2015 | 06 | 2015 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,265 | $11,000 | Implemented |
MI0271 # 07 Y:2015 | 07 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,527 | $6,000 | Not Implemented |
MI0271 # 08 Y:2015 | 08 | 2015 | USE PHOTOCELL CONTROLS | $2,361 | $1,080 | Not Implemented |
MI0271 # 09 Y:2015 | 09 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,647 | $80 | Not Implemented |
MI0271 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,369 | $4,590 | Implemented |
MI0271 # 11 Y:2015 | 11 | 2015 | INSTALL OCCUPANCY SENSORS | $956 | $373 | Implemented |
AM0674 # 01 Y:2015 | 01 | 2015 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $23,350 | $24,500 | Not Implemented |
AM0674 # 02 Y:2015 | 02 | 2015 | OPTIMIZE PLANT POWER FACTOR | $4,070 | $3,950 | Not Implemented |
AM0674 # 03 Y:2015 | 03 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $2,350 | $440 | Implemented |
AM0674 # 04 Y:2015 | 04 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,420 | $5 | Not Implemented |
AM0674 # 05 Y:2015 | 05 | 2015 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,185 | $500 | Implemented |
AM0674 # 06 Y:2015 | 06 | 2015 | INSULATE FEEDWATER TANK | $950 | $140 | Not Implemented |
AM0674 # 07 Y:2015 | 07 | 2015 | INSTALL SKYLIGHTS | $625 | $970 | Not Implemented |
AM0674 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $550 | $275 | Implemented |