IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0034 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $315 $700 Not Implemented
KU0034 # 07 Y:1982 07 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $695 $600 Not Implemented
KU0035 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,065 $36,000 Not Implemented
KU0035 # 02 Y:1982 02 1982 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,995 $59,000 Not Implemented
KU0035 # 03 Y:1982 03 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $24,810 $0 Not Implemented
KU0035 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,265 $535 Implemented
KU0035 # 05 Y:1982 05 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $8,165 $22,000 Implemented
KU0036 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,455 $1,375 Not Implemented
KU0036 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $360 $150 Not Implemented
KU0036 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $140 Not Implemented
KU0036 # 04 Y:1982 04 1982 USE DEMAND CONTROLLER OR LOAD SHEDDER $484 $2,500 Not Implemented
KU0036 # 05 Y:1982 05 1982 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $3,212 $10,500 Not Implemented
KU0037 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,133 $5,362 Not Implemented
KU0037 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,075 $250 Not Implemented
KU0037 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,270 $400 Not Implemented
KU0037 # 04 Y:1982 04 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $223 $225 Not Implemented
KU0037 # 05 Y:1982 05 1982 USE DEMAND CONTROLLER OR LOAD SHEDDER $959 $2,500 Not Implemented
KU0030 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $740 $100 Not Implemented
KU0030 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $3,000 Not Implemented
KU0030 # 03 Y:1982 03 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $439 $0 Not Implemented
KU0030 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,297 $500 Not Implemented
KU0030 # 05 Y:1982 05 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,146 $3,500 Not Implemented
KU0030 # 06 Y:1982 06 1982 REDESIGN PROCESS $11,311 $80,000 Not Implemented
KU0031 # 01 Y:1982 01 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $368 $450 Not Implemented
KU0031 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,393 $725 Not Implemented