IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0439 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $187 $200 Implemented
OK0439 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $665 $851 Not Implemented
OK0439 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,114 $800 Not Implemented
OK0439 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $766 $0 Implemented
OK0439 # 07 Y:1994 07 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,266 $3,750 Not Implemented
AR0021 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,260 $6,000 Implemented
AR0021 # 02 Y:1994 02 1994 USE OPTIMUM THICKNESS INSULATION $855 $100 Implemented
AR0021 # 03 Y:1994 03 1994 OPTIMIZE PLANT POWER FACTOR $20,139 $9,600 Implemented
AR0021 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,558 $150 Implemented
AR0021 # 05 Y:1994 05 1994 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $3,017 $5,760 Implemented
AR0021 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $794 $300 Implemented
AR0021 # 07 Y:1994 07 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,740 $790 Implemented
AR0021 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,386 $822 Implemented
AR0021 # 09 Y:1994 09 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,947 $0 Implemented
GT0520 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,300 $9,420 Implemented
GT0520 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $460 $835 Implemented
GT0520 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,900 $450 Implemented
GT0520 # 04 Y:1994 04 1994 REPAIR AND ELIMINATE STEAM LEAKS $3,845 $500 Implemented
GT0520 # 05 Y:1994 05 1994 USE MINIMUM STEAM OPERATING PRESSURE $2,350 $0 Not Implemented
GT0520 # 06 Y:1994 06 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,350 $0 Implemented
GT0520 # 07 Y:1994 07 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $81,750 $124,600 Not Implemented
OK0429 # 01 Y:1994 01 1994 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $1,839 $2,500 Implemented
OK0429 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,730 $1,600 Implemented
OK0429 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,310 $0 Implemented
OK0429 # 04 Y:1994 04 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $638 $0 Implemented