IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0645 # 08 Y:2024 08 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $49,587 $0 Not Implemented
AM0893 # 01 Y:2024 01 2024 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $70,280 $188,400 n/a
AM0893 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $8,610 $86,040 n/a
AM0893 # 03 Y:2024 03 2024 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,275 $4,340 n/a
AM0893 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,555 $3,000 n/a
AM0893 # 05 Y:2024 05 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,506 $0 n/a
AM0893 # 06 Y:2024 06 2024 USE PHOTOCELL CONTROLS $131 $42 n/a
AM0896 # 01 Y:2024 01 2024 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $7,624 $20,000 n/a
AM0896 # 02 Y:2024 02 2024 USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES $298 $8,505 n/a
AM0896 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $21,267 $280,800 n/a
AM0896 # 04 Y:2024 04 2024 MAINTAIN MACHINES TO REDUCE LEAKS $1,625 $5,000 n/a
UU0238 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $13,223 $4,080 Implemented
UU0238 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,624 $12,621 Implemented
UU0238 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $7,670 $22,500 Not Implemented
UU0238 # 04 Y:2024 04 2024 CLEAN CONDENSER TUBES $3,894 $3,890 Implemented
UU0238 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,731 $5,916 Implemented
WM0208 # 01 Y:2024 01 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $37,878 $122,100 Not Implemented
WM0208 # 02 Y:2024 02 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,702 $8,700 Implemented
WM0208 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,761 $1,950 Implemented
WM0208 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,796 $0 Not Implemented
WM0208 # 05 Y:2024 05 2024 USE COMPRESSOR AIR FILTERS $3,395 $4,786 Not Implemented
WM0208 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,014 $4,664 Implemented
WM0208 # 07 Y:2024 07 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $430 $700 Implemented
WM0207 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,028 $12,825 Implemented
WM0207 # 02 Y:2024 02 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $16,759 $2,500 Not Implemented