Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,707
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0377 # 09 Y:2005 | 09 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,898 | $2,550 | Not Implemented |
IA0377 # 10 Y:2005 | 10 | 2005 | INSTALL TIMERS AND/OR THERMOSTATS | $2,898 | $456 | Implemented |
IA0377 # 11 Y:2005 | 11 | 2005 | INSTALL REPLACEMENT DOORS | $725 | $240 | Implemented |
IA0377 # 12 Y:2005 | 12 | 2005 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $5,934 | $15,000 | Not Implemented |
IA0371 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,255 | $100 | Implemented |
IA0371 # 02 Y:2005 | 02 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $946 | $25 | Implemented |
IA0371 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,300 | $157,360 | Not Implemented |
IA0371 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $346 | $0 | Not Implemented |
IA0371 # 05 Y:2005 | 05 | 2005 | REDUCE SCRAP PRODUCTION | $2,050 | $171 | Not Implemented |
IA0371 # 06 Y:2005 | 06 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $2,400 | $300 | Not Implemented |
IA0371 # 07 Y:2005 | 07 | 2005 | MINIMIZE WATER USAGE | $668 | $82 | Not Implemented |
IA0371 # 08 Y:2005 | 08 | 2005 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,250 | $200 | Not Implemented |
IA0361 # 01 Y:2005 | 01 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $781 | $25 | Not Implemented |
IA0361 # 02 Y:2005 | 02 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,729 | $429 | Implemented |
IA0361 # 03 Y:2005 | 03 | 2005 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $919 | $172 | Implemented |
IA0361 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,960 | $1,114 | Implemented |
IA0361 # 05 Y:2005 | 05 | 2005 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $421 | $850 | Implemented |
IA0361 # 06 Y:2005 | 06 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $577 | $1,080 | Not Implemented |
IA0358 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,532 | $1,000 | Implemented |
IA0358 # 02 Y:2004 | 02 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $36,969 | $18,000 | Implemented |
IA0358 # 03 Y:2004 | 03 | 2004 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $2,577 | $1,000 | Implemented |
IA0358 # 04 Y:2004 | 04 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,528 | $359 | Implemented |
IA0358 # 05 Y:2004 | 05 | 2004 | COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER | $3,523 | $1,800 | Not Implemented |
IA0358 # 06 Y:2004 | 06 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,052 | $609 | Not Implemented |
IA0358 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $633 | $633 | Implemented |