IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,380

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0162 # 03 Y:1989 03 1989 INSTALL EFFICIENT RECTIFIERS $14,209 $8,500 Not Implemented
MA0162 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,765 $400 Not Implemented
MA0162 # 05 Y:1989 05 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $636 $1,041 Not Implemented
MA0162 # 06 Y:1989 06 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,259 $14,920 Not Implemented
MA0162 # 07 Y:1989 07 1989 INSTALL SET-BACK TIMERS $712 $150 Not Implemented
MA0163 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $285 Implemented
MA0163 # 02 Y:1989 02 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,427 $0 Implemented
MA0163 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,670 $0 Not Implemented
MA0163 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $9,247 $7,253 Not Implemented
MA0163 # 05 Y:1989 05 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,890 $4,255 Not Implemented
MA0163 # 06 Y:1989 06 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,603 $13,662 Not Implemented
MA0164 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $187 Not Implemented
MA0164 # 02 Y:1989 02 1989 INSULATE BARE EQUIPMENT $4,170 $3,456 Not Implemented
MA0164 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $529 $500 Not Implemented
MA0164 # 04 Y:1989 04 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,624 $17,000 Not Implemented
MA0164 # 05 Y:1989 05 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,159 $4,126 Not Implemented
RU0071 # 01 Y:1989 01 1989 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,813 $0 Not Implemented
RU0071 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $360 $295 Implemented
RU0071 # 03 Y:1989 03 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $738 $0 Not Implemented
RU0071 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $554 $117 Not Implemented
RU0071 # 05 Y:1989 05 1989 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,352 $50 Implemented
RU0071 # 06 Y:1989 06 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,906 $6,800 Not Implemented
RU0071 # 07 Y:1989 07 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,674 $2,700 Not Implemented
RU0071 # 08 Y:1989 08 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,772 $500 Implemented
RU0073 # 01 Y:1989 01 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,457 $450 Not Implemented