IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0006 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $279 n/a
TR0006 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $5,324 $88 n/a
TR0006 # 04 Y:2017 04 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $31,644 $0 n/a
TR0006 # 05 Y:2017 05 2017 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,005 $208 n/a
TR0006 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $117,470 $11,908 n/a
TR0006 # 07 Y:2017 07 2017 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $11,119 $3,360 n/a
TR0006 # 08 Y:2017 08 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $23,655 $0 n/a
AM0739 # 01 Y:2017 01 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $44,300 $31,800 Implemented
AM0739 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $17,900 $28,900 Not Implemented
AM0739 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,430 $0 Implemented
AM0739 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,820 $9,600 Implemented
AM0739 # 05 Y:2017 05 2017 USE SYNTHETIC LUBRICANT $2,400 $0 Implemented
AM0739 # 06 Y:2017 06 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $1,870 $0 Not Implemented
AM0739 # 07 Y:2017 07 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $730 $300 Implemented
AM0739 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $300 Implemented
NC0601 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,641 $200 Implemented
NC0601 # 02 Y:2017 02 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,840 $750 Not Implemented
NC0601 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,606 $100 Not Implemented
NC0601 # 04 Y:2017 04 2017 KEEP BOILER TUBES CLEAN $2,408 $1,000 Implemented
NC0601 # 05 Y:2017 05 2017 INSULATE FEEDWATER TANK $792 $750 Not Implemented
NC0601 # 06 Y:2017 06 2017 RECOVER WASTE HEAT FROM EQUIPMENT $15,825 $82,000 Not Implemented
NC0601 # 07 Y:2017 07 2017 ADOPT IN-HOUSE MATERIAL GENERATION $21,773 $20,000 Not Implemented
NC0601 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $217 $487 Not Implemented
NC0601 # 09 Y:2017 09 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,876 $30 Not Implemented
NL0014 # 01 Y:2017 01 2017 INSTALL TIMERS AND/OR THERMOSTATS $9,200 $1,630 Implemented