Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0006 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $271 | $279 | n/a |
TR0006 # 03 Y:2017 | 03 | 2017 | INSULATE BARE EQUIPMENT | $5,324 | $88 | n/a |
TR0006 # 04 Y:2017 | 04 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $31,644 | $0 | n/a |
TR0006 # 05 Y:2017 | 05 | 2017 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,005 | $208 | n/a |
TR0006 # 06 Y:2017 | 06 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $117,470 | $11,908 | n/a |
TR0006 # 07 Y:2017 | 07 | 2017 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $11,119 | $3,360 | n/a |
TR0006 # 08 Y:2017 | 08 | 2017 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $23,655 | $0 | n/a |
AM0739 # 01 Y:2017 | 01 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $44,300 | $31,800 | Implemented |
AM0739 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $17,900 | $28,900 | Not Implemented |
AM0739 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,430 | $0 | Implemented |
AM0739 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,820 | $9,600 | Implemented |
AM0739 # 05 Y:2017 | 05 | 2017 | USE SYNTHETIC LUBRICANT | $2,400 | $0 | Implemented |
AM0739 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,870 | $0 | Not Implemented |
AM0739 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $730 | $300 | Implemented |
AM0739 # 08 Y:2017 | 08 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $540 | $300 | Implemented |
NC0601 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,641 | $200 | Implemented |
NC0601 # 02 Y:2017 | 02 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,840 | $750 | Not Implemented |
NC0601 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,606 | $100 | Not Implemented |
NC0601 # 04 Y:2017 | 04 | 2017 | KEEP BOILER TUBES CLEAN | $2,408 | $1,000 | Implemented |
NC0601 # 05 Y:2017 | 05 | 2017 | INSULATE FEEDWATER TANK | $792 | $750 | Not Implemented |
NC0601 # 06 Y:2017 | 06 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,825 | $82,000 | Not Implemented |
NC0601 # 07 Y:2017 | 07 | 2017 | ADOPT IN-HOUSE MATERIAL GENERATION | $21,773 | $20,000 | Not Implemented |
NC0601 # 08 Y:2017 | 08 | 2017 | INSTALL OCCUPANCY SENSORS | $217 | $487 | Not Implemented |
NC0601 # 09 Y:2017 | 09 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $2,876 | $30 | Not Implemented |
NL0014 # 01 Y:2017 | 01 | 2017 | INSTALL TIMERS AND/OR THERMOSTATS | $9,200 | $1,630 | Implemented |