IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0076 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,324 $3,981 Implemented
MO0076 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $4,492 $7,920 Implemented
MO0076 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,747 $4,462 Implemented
MO0076 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,316 $735 Not Implemented
MO0076 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,141 $318 Implemented
UF0047 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,741 $846 Implemented
UF0047 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $429 $1,876 Implemented
UF0047 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $295 $170 Not Implemented
UF0047 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $230 $842 Implemented
UF0047 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $184 $200 Not Implemented
UF0047 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,121 $13,800 Not Implemented
AM0168 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $6,380 $20,925 Not Implemented
AM0168 # 02 Y:1993 02 1993 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $7,055 $1,160 Not Implemented
AM0168 # 03 Y:1993 03 1993 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,568 $3,090 Not Implemented
AM0168 # 04 Y:1993 04 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,650 $7,350 Not Implemented
AM0168 # 05 Y:1993 05 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $420 Implemented
AM0168 # 06 Y:1993 06 1993 INSULATE BARE EQUIPMENT $990 $2,140 Implemented
AM0168 # 07 Y:1993 07 1993 RECOVER WASTE HEAT FROM EQUIPMENT $390 $1,000 Not Implemented
AM0168 # 08 Y:1993 08 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $530 $153 Implemented
AM0168 # 09 Y:1993 09 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $299 $0 Not Implemented
AM0169 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $3,000 $14,000 Not Implemented
AM0169 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $319 $0 Implemented
AM0169 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $810 $2,000 Implemented
AM0169 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $820 $1,700 Not Implemented
AM0169 # 05 Y:1993 05 1993 PAY UTILITY BILLS ON TIME $540 $0 Not Implemented