IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0628 # 08 Y:2013 08 2013 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $520 $0 Implemented
AM0628 # 09 Y:2013 09 2013 USE SYNTHETIC LUBRICANT $240 $0 Not Implemented
NC0475 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,801 $48,075 Not Implemented
NC0475 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $9,597 $5,600 Not Implemented
NC0475 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $1,124 Not Implemented
NC0475 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $100 Not Implemented
NC0475 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $11,988 $4,750 Not Implemented
NC0475 # 06 Y:2013 06 2013 REDUCE FLUID FLOW RATES $16,217 $25,000 Not Implemented
NC0474 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,078 $1,180 Implemented
NC0474 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $3,817 $7,000 Not Implemented
NC0474 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,019 $3,470 Implemented
NC0474 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,431 $1,000 Implemented
NC0474 # 07 Y:2013 07 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $11,656 $25,000 Not Implemented
NC0474 # 08 Y:2013 08 2013 REPAIR OR REPLACE STEAM TRAPS $13,419 $5,700 Implemented
NC0474 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,672 $100 Implemented
OK0838 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,128 $0 Implemented
OK0838 # 02 Y:2013 02 2013 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,735 $2,099 Not Implemented
OK0838 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,393 $2,746 Implemented
OK0838 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,439 $28,635 Not Implemented
OK0838 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $501 $2,086 Not Implemented
OK0838 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,834 $9,882 Not Implemented
OK0838 # 07 Y:2013 07 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,120 $12,920 Not Implemented
OK0838 # 08 Y:2013 08 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,655 $12,285 Implemented
OK0838 # 09 Y:2013 09 2013 INSTALL TIMERS AND/OR THERMOSTATS $5,387 $1,980 Implemented
OK0838 # 10 Y:2013 10 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $6,915 $1,728 Implemented