IAC logo
IAC Assessment: NC0475
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0475
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2013
Principal Product Water meters
NAICS 334514 - Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3824 - Fluid Meters And Counting Devices
Sales $10,000,000-$50,000,000
# of Employees 175
Plant Area (Sq.Ft.) 126,000
Annual Production 10 Units
Production Hrs. Annual 7,200
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,561 5,707,760 kWh $0.05
Electricity Demand $73,727 10,945 kW-months/year $6.74
Electricity Fees $726 - $ -
Natural Gas $16,186 1,914 MMBtu $8.46
TOTAL ENERGY COSTS $371,200
RECOMMENDED SAVINGS* $68,198 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$28,801
Cost:
$48,075
$23,919 486,662 $5,467 811 - - - - $(-585) - $23,919
486,662
kWh
$5,467
811
kW-months/year
-
-
MMBtu
-
-
$
$(-585)
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,597
Cost:
$5,600
$9,338 189,997 $259 38 - - - - - - $9,338
189,997
kWh
$259
38
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$975
Cost:
$1,124
$332 6,760 $62 9 - - - - $581 - $332
6,760
kWh
$62
9
kW-months/year
-
-
MMBtu
-
-
$
$581
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$620
Cost:
$100
$1,188 24,170 $272 40 - - $(-600) - $(-240) - $1,188
24,170
kWh
$272
40
kW-months/year
-
-
MMBtu
$(-600)
-
$
$(-240)
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,988
Cost:
$4,750
- - - - $11,988 1,417 - - - - -
-
kWh
-
-
kW-months/year
$11,988
1,417
MMBtu
-
-
$
-
-
$
06: 2.5123 REDUCE FLUID FLOW RATES Savings:
$16,217
Cost:
$25,000
$13,200 268,560 $3,017 448 - - - - - - $13,200
268,560
kWh
$3,017
448
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$68,198
Cost:
$84,649
$47,977 976,149 $9,077 1,346 $11,988 1,417 $(-600) - $(-244) - $47,977
976,149
kWh
$9,077
1,346
kW-months/year
$11,988
1,417
MMBtu
$(-600)
-
$
$(-244)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost