IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0057 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $415 $250 Not Implemented
NC0057 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $680 $984 Not Implemented
NC0057 # 05 Y:1995 05 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,881 $10,000 Not Implemented
TN0549 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $890 $1,520 Implemented
TN0549 # 02 Y:1995 02 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,249 $4,640 Not Implemented
TN0549 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,374 $770 Not Implemented
NC0055 # 01 Y:1995 01 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,521 $1,200 Implemented
NC0055 # 02 Y:1995 02 1995 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $144,508 $638,000 Not Implemented
NC0055 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,431 $480 Implemented
NC0055 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $658 $3,360 Implemented
NC0055 # 05 Y:1995 05 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,143 $28,000 Not Implemented
NC0055 # 06 Y:1995 06 1995 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $56,724 $55,000 Not Implemented
NC0055 # 07 Y:1995 07 1995 MINIMIZE WATER USAGE $8,114 $10,000 Not Implemented
NC0055 # 08 Y:1995 08 1995 MINIMIZE WATER USAGE $331,638 $1,750,000 Not Implemented
NC0054 # 01 Y:1995 01 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,963 $1,500 Not Implemented
NC0054 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,092 $360 Implemented
NC0054 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,362 $11,760 Not Implemented
NC0054 # 04 Y:1995 04 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,675 $475 Not Implemented
NC0054 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,438 $5,749 Implemented
NC0056 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $168 $152 Implemented
NC0056 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,092 $250 Implemented
NC0056 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,032 $480 Implemented
NC0056 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,969 $620 Implemented
NC0056 # 05 Y:1995 05 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,813 $320 Implemented
NC0056 # 06 Y:1995 06 1995 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,221 $0 Implemented