Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1995 |
Principal Product | Rubber Products |
NAICS | n/a |
SIC | 3069 - Fabricated Rubber Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 175 |
Plant Area (Sq.Ft.) | 137,500 |
Annual Production | 2,250,000 Pounds |
Production Hrs. Annual | 5,000 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $594,446 | 9,129,250 | kWh | $0.07 |
Natural Gas | $68,995 | 15,796 | MMBtu | $4.37 |
Other Energy | $152,675 | 136,317 | MMBtu | $1.12 |
TOTAL ENERGY COSTS | $816,116 | |||
RECOMMENDED SAVINGS* | $56,483 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,468 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Energy | Electricity Usage | Natural Gas | Other Energy | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $21,000 Cost: $45,000 |
$21,000 | 419,988 | - | - | - | - |
$21,000 419,988 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $388 Cost: $300 |
$388 | 6,741 | - | - | - | - |
$388 6,741 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $580 Cost: $588 |
$580 | 9,965 | - | - | - | - |
$580 9,965 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $192 Cost: $168 |
$192 | 3,224 | - | - | - | - |
$192 3,224 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7314 REDUCE VENTILATION AIR |
Savings: $782 Cost: $1,250 |
- | - | - | - | $782 | 680 |
- - kWh |
- - MMBtu |
$782 680 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $538 Cost: $864 |
- | - | - | - | $538 | 459 |
- - kWh |
- - MMBtu |
$538 459 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $20,681 Cost: $40,000 |
$42,241 | 746,190 | - | - | $(-21,560) | (-18,600) |
$42,241 746,190 kWh |
- - MMBtu |
$(-21,560) (-18,600) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $6,888 Cost: $7,500 |
$6,888 | 137,749 | - | - | - | - |
$6,888 137,749 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1335 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS |
Savings: $5,434 Cost: $7,200 |
- | - | $6,865 | 1,571 | $(-1,431) | (-1,222) |
- - kWh |
$6,865 1,571 MMBtu |
$(-1,431) (-1,222) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,483 Cost: $102,870 |
$71,289 | 1,323,857 | $6,865 | 1,571 | $(-21,671) | (-18,683) | $71,289 1,323,857 kWh |
$6,865 1,571 MMBtu |
$(-21,671) (-18,683) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,468 Cost: $52,968 |
$28,468 | 567,702 | - | - | - | - | $28,468 567,702 kWh |
- - MMBtu |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Energy | Electricity Usage | Natural Gas | Other Energy |