IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0414 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $1,182 $910 Implemented
MA0414 # 08 Y:1998 08 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $117,280 $1,000,000 Not Implemented
MA0415 # 01 Y:1998 01 1998 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $47,834 $5,100 Not Implemented
MA0415 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $53,137 $200,000 Not Implemented
MA0415 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $62,915 $200,000 Not Implemented
MA0415 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,174 $10,000 Not Implemented
MA0415 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,748 $2,019 Implemented
MA0415 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,750 $17,906 Implemented
MA0415 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $1,487 $5,700 Not Implemented
HO0184 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $572 $1,525 Implemented
HO0184 # 02 Y:1998 02 1998 KEEP LAMPS AND REFLECTORS CLEAN $1,669 $0 Implemented
HO0184 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,692 $946 Not Implemented
HO0184 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $755 $500 Not Implemented
HO0184 # 05 Y:1998 05 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,835 $0 Implemented
HO0184 # 06 Y:1998 06 1998 MAINTAIN MACHINES TO REDUCE LEAKS $360 $100 Implemented
HO0184 # 07 Y:1998 07 1998 IMPROVE CLEANING EFFICIENCY BY MAINTAINING CLEANING SYSTEM $5,850 $500 Not Implemented
HO0184 # 08 Y:1998 08 1998 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $4,469 $200 Implemented
HO0184 # 09 Y:1998 09 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,459 $27,500 Not Implemented
MA0412 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,681 $7,454 Implemented
MA0412 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,189 $9,625 Not Implemented
MA0412 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,088 $323 Implemented
MA0412 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,686 $3,400 Implemented
MA0412 # 05 Y:1998 05 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $403 Implemented
MA0412 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $65,920 $385,000 Not Implemented
MA0412 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,050 $7,800 Not Implemented