Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0292 # 01 Y:2002 | 01 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,946 | $24,472 | Implemented |
UF0292 # 02 Y:2002 | 02 | 2002 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $7,392 | $6,547 | Implemented |
UF0292 # 03 Y:2002 | 03 | 2002 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,788 | $50 | Implemented |
UF0292 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,347 | $350 | Implemented |
UF0292 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $587 | $0 | Implemented |
UF0292 # 06 Y:2002 | 06 | 2002 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $46,032 | $4,000 | Implemented |
UF0292 # 07 Y:2002 | 07 | 2002 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $468 | $0 | Implemented |
UF0292 # 08 Y:2002 | 08 | 2002 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $2,808 | $876 | Not Implemented |
UF0292 # 09 Y:2002 | 09 | 2002 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $11,250 | $24,938 | Implemented |
UF0292 # 10 Y:2002 | 10 | 2002 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $140,438 | $39,000 | Implemented |
OK0634 # 01 Y:2002 | 01 | 2002 | INSULATE BARE EQUIPMENT | $2,496 | $823 | Implemented |
OK0634 # 02 Y:2002 | 02 | 2002 | OPERATE BOILERS ON HIGH FIRE SETTING | $2,910 | $4,125 | Implemented |
OK0634 # 03 Y:2002 | 03 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,571 | $6,000 | Not Implemented |
OK0634 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $218 | $255 | Implemented |
OK0634 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $532 | $282 | Not Implemented |
OK0634 # 06 Y:2002 | 06 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $992 | $1,679 | Implemented |
OK0634 # 07 Y:2002 | 07 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $216 | $2,500 | Not Implemented |
OK0634 # 08 Y:2002 | 08 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $7,297 | $1,028 | Implemented |
OK0634 # 09 Y:2002 | 09 | 2002 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $20,476 | $1,800 | Not Implemented |
OK0634 # 10 Y:2002 | 10 | 2002 | REPAIR OR REPLACE STEAM TRAPS | $33,934 | $525 | Implemented |
WI0412 # 01 Y:2002 | 01 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,881 | $1,200 | Implemented |
WI0412 # 02 Y:2002 | 02 | 2002 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $8,966 | $11,000 | Not Implemented |
WI0412 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,780 | $0 | Not Implemented |
WI0412 # 04 Y:2002 | 04 | 2002 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,383 | $10,000 | n/a |
WI0412 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,774 | $90 | Implemented |