IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0292 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,946 $24,472 Implemented
UF0292 # 02 Y:2002 02 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,392 $6,547 Implemented
UF0292 # 03 Y:2002 03 2002 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,788 $50 Implemented
UF0292 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,347 $350 Implemented
UF0292 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $587 $0 Implemented
UF0292 # 06 Y:2002 06 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $46,032 $4,000 Implemented
UF0292 # 07 Y:2002 07 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $468 $0 Implemented
UF0292 # 08 Y:2002 08 2002 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $2,808 $876 Not Implemented
UF0292 # 09 Y:2002 09 2002 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $11,250 $24,938 Implemented
UF0292 # 10 Y:2002 10 2002 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $140,438 $39,000 Implemented
OK0634 # 01 Y:2002 01 2002 INSULATE BARE EQUIPMENT $2,496 $823 Implemented
OK0634 # 02 Y:2002 02 2002 OPERATE BOILERS ON HIGH FIRE SETTING $2,910 $4,125 Implemented
OK0634 # 03 Y:2002 03 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,571 $6,000 Not Implemented
OK0634 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $218 $255 Implemented
OK0634 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $532 $282 Not Implemented
OK0634 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $992 $1,679 Implemented
OK0634 # 07 Y:2002 07 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $216 $2,500 Not Implemented
OK0634 # 08 Y:2002 08 2002 UPGRADE CONTROLS ON COMPRESSORS $7,297 $1,028 Implemented
OK0634 # 09 Y:2002 09 2002 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $20,476 $1,800 Not Implemented
OK0634 # 10 Y:2002 10 2002 REPAIR OR REPLACE STEAM TRAPS $33,934 $525 Implemented
WI0412 # 01 Y:2002 01 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,881 $1,200 Implemented
WI0412 # 02 Y:2002 02 2002 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $8,966 $11,000 Not Implemented
WI0412 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,780 $0 Not Implemented
WI0412 # 04 Y:2002 04 2002 DISTILL CONTAMINATED SOLVENTS FOR REUSE $3,383 $10,000 n/a
WI0412 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,774 $90 Implemented