IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,521

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0397 # 08 Y:1990 08 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,910 $15,000 Not Implemented
GT0398 # 01 Y:1990 01 1990 INSTALL SET-BACK TIMERS $817 $400 Not Implemented
GT0398 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,130 $14,910 Not Implemented
GT0398 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,472 $3,777 Not Implemented
GT0398 # 04 Y:1990 04 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $634 $0 Not Implemented
GT0398 # 05 Y:1990 05 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,294 $15,320 Not Implemented
GT0398 # 06 Y:1990 06 1990 REPAIR AND ELIMINATE STEAM LEAKS $1,275 $2,843 Not Implemented
GT0398 # 07 Y:1990 07 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $201 $0 Not Implemented
GT0398 # 08 Y:1990 08 1990 ELIMINATE LEAKS IN WATER LINES AND VALVES $340 $200 Not Implemented
GT0398 # 09 Y:1990 09 1990 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $25,600 $1,500 Not Implemented
GT0398 # 10 Y:1990 10 1990 RECOVER WASTE HEAT FROM EQUIPMENT $19,050 $76,500 Not Implemented
GT0395 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $12,473 $5,292 Implemented
GT0395 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $877 $187 Implemented
GT0395 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,749 $2,250 Implemented
GT0395 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,422 $0 Implemented
GT0395 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,220 $10,000 Not Implemented
GT0395 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $650 $1,385 Not Implemented
GT0395 # 07 Y:1989 07 1989 REDUCE FLUID FLOW RATES $26,673 $3,000 Implemented
GT0390 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,040 $0 Implemented
GT0390 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $604 $2,400 Implemented
GT0390 # 03 Y:1989 03 1989 INSULATE BARE EQUIPMENT $534 $1,020 Implemented
GT0390 # 04 Y:1989 04 1989 INSTALL / REPAIR INSULATION ON STEAM LINES $423 $210 Implemented
GT0390 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $219 $350 Implemented
GT0390 # 06 Y:1989 06 1989 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $14,480 $16,950 Not Implemented
GT0390 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $68,230 $29,500 Implemented