IAC logo
IAC Assessment: GT0413
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0413
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1990
Principal Product ATHLETIC SOCKS
NAICS n/a
SIC 2252 - Hosiery, Nec
Sales n/a
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 9,000,000 Pieces
Production Hrs. Annual 4,250
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $37,712 422,626 kWh $0.09
Natural Gas $37,880 6,709 MMBtu $5.65
TOTAL ENERGY COSTS $75,592
RECOMMENDED SAVINGS* $19,470 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,400
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$621
Cost:
$122
$621 7,034 - - $621
7,034
kWh
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$650
Cost:
$450
- - $650 115 -
-
kWh
$650
115
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$129
Cost:
$703
$129 1,465 - - $129
1,465
kWh
-
-
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$15,190
Cost:
$73,850
$20,685 231,829 $(-5,495) (-973) $20,685
231,829
kWh
$(-5,495)
(-973)
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,170
Cost:
$1,120
- - $2,170 385 -
-
kWh
$2,170
385
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$710
Cost:
$850
- - $710 125 -
-
kWh
$710
125
MMBtu
TOTAL RECOMMENDED Savings:
$19,470
Cost:
$77,095
$21,435 240,328 $(-1,965) (-348) $21,435
240,328
kWh
$(-1,965)
(-348)
MMBtu
TOTAL IMPLEMENTED Savings:
$1,400
Cost:
$1,275
$750 8,499 $650 115 $750
8,499
kWh
$650
115
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas