IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0612 # 03 Y:2001 03 2001 INSTALL TIMERS AND/OR THERMOSTATS $782 $800 Implemented
UD0612 # 04 Y:2001 04 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $765 $3,000 Not Implemented
UD0612 # 05 Y:2001 05 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $533 $1,200 Implemented
UD0612 # 06 Y:2001 06 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $528 $600 Not Implemented
UF0269 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $775 $1,200 Implemented
UF0269 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $706 $410 Implemented
UF0269 # 03 Y:2001 03 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,613 $64,742 Implemented
UF0269 # 04 Y:2001 04 2001 ADD AREA LIGHTING SWITCHES $2,086 $2,358 Implemented
UF0269 # 05 Y:2001 05 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $314 $75 Implemented
UF0269 # 06 Y:2001 06 2001 INSULATE BARE EQUIPMENT $20,239 $2,500 Implemented
UF0269 # 07 Y:2001 07 2001 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $5,760 $3,985 Implemented
UF0269 # 08 Y:2001 08 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $316 $1,895 Implemented
UF0269 # 09 Y:2001 09 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $10,697 $0 Not Implemented
UF0269 # 10 Y:2001 10 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $777 $525 Not Implemented
SF0211 # 01 Y:2001 01 2001 REPAIR AND ELIMINATE STEAM LEAKS $13,186 $1,585 Implemented
SF0211 # 02 Y:2001 02 2001 REPAIR OR REPLACE STEAM TRAPS $13,868 $2,580 Implemented
SF0211 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $5,381 $1,590 Not Implemented
SF0211 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,893 $1,200 Not Implemented
SF0211 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $13,029 $9,546 Implemented
SF0211 # 06 Y:2001 06 2001 REPLACE BOILER $18,515 $22,255 Implemented
SF0211 # 07 Y:2001 07 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,670 $3,218 Implemented
SF0211 # 08 Y:2001 08 2001 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,773 $4,250 Not Implemented
SF0211 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,659 $7,791 Implemented
SF0211 # 10 Y:2001 10 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,741 $0 Implemented
WI0389 # 01 Y:2001 01 2001 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,193 $1,000 Implemented