Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0371 # 01 Y:2000 | 01 | 2000 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $24,407 | $25,200 | Not Implemented |
WI0371 # 02 Y:2000 | 02 | 2000 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,743 | $0 | Implemented |
WI0371 # 03 Y:2000 | 03 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,046 | $1,000 | Not Implemented |
WI0371 # 04 Y:2000 | 04 | 2000 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,684 | $0 | Implemented |
WI0371 # 05 Y:2000 | 05 | 2000 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $7,221 | $0 | Not Implemented |
WI0371 # 06 Y:2000 | 06 | 2000 | INSTALL OCCUPANCY SENSORS | $2,725 | $7,200 | Not Implemented |
WI0371 # 07 Y:2000 | 07 | 2000 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $2,030 | $6,090 | Not Implemented |
WI0371 # 08 Y:2000 | 08 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,686 | $3,150 | Not Implemented |
WI0371 # 09 Y:2000 | 09 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $602 | $740 | Not Implemented |
WI0371 # 10 Y:2000 | 10 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $370 | $0 | Implemented |
WI0371 # 11 Y:2000 | 11 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $282 | $500 | Implemented |
WI0370 # 01 Y:2000 | 01 | 2000 | CLEAR AND RENT EXISTING SPACE | $34,613 | $0 | Not Implemented |
WI0370 # 02 Y:2000 | 02 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $30,575 | $2,955 | Not Implemented |
WI0370 # 03 Y:2000 | 03 | 2000 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $3,255 | $0 | Implemented |
WI0370 # 04 Y:2000 | 04 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,441 | $7,400 | Not Implemented |
WI0370 # 05 Y:2000 | 05 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,130 | $0 | Not Implemented |
WI0370 # 06 Y:2000 | 06 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,218 | $740 | Not Implemented |
WI0370 # 07 Y:2000 | 07 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,297 | $1,410 | Not Implemented |
WI0370 # 08 Y:2000 | 08 | 2000 | INSTALL OCCUPANCY SENSORS | $669 | $450 | Not Implemented |
WI0370 # 09 Y:2000 | 09 | 2000 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $627 | $500 | Not Implemented |
SF0188 # 01 Y:2000 | 01 | 2000 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,117 | $2,000 | Not Implemented |
SF0188 # 02 Y:2000 | 02 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,374 | $1,180 | Not Implemented |
SF0188 # 03 Y:2000 | 03 | 2000 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,040 | $4,040 | Not Implemented |
SF0188 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,799 | $5,490 | Not Implemented |
SF0188 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $3,301 | $0 | Not Implemented |