IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0020 # 06 Y:1994 06 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,983 $670 Implemented
UD0425 # 01 Y:1994 01 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,450 $0 Implemented
UD0425 # 02 Y:1994 02 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,026 $0 Not Implemented
UD0425 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $398 $3,000 Implemented
UD0425 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,545 $15,950 Implemented
UD0425 # 05 Y:1994 05 1994 COMBINE UTILITY METERS $355 $0 Implemented
UD0426 # 01 Y:1994 01 1994 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $24,064 $500 Implemented
UD0426 # 02 Y:1994 02 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,565 $38,000 Implemented
UD0426 # 03 Y:1994 03 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,342 $0 Not Implemented
UD0426 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,032 $400 Implemented
UD0426 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,752 $2,000 Implemented
WV0028 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $107 $182 Implemented
WV0028 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $109 $6,070 Implemented
WV0028 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,408 $336 Not Implemented
WV0028 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,528 $5,000 Not Implemented
WV0028 # 05 Y:1994 05 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $9,115 $680 Not Implemented
WV0028 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $904 $0 Not Implemented
WV0028 # 07 Y:1994 07 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $657 $377 Not Implemented
WV0028 # 08 Y:1994 08 1994 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,456 $1,172 Not Implemented
WV0028 # 09 Y:1994 09 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,195 $1,244 Not Implemented
WV0028 # 10 Y:1994 10 1994 USE SYNTHETIC LUBRICANT $639 $0 Implemented
DS0002 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,387 $5,687 Implemented
DS0002 # 02 Y:1994 02 1994 INSULATE BARE EQUIPMENT $731 $130 Implemented
DS0002 # 03 Y:1994 03 1994 USE OPTIMUM THICKNESS INSULATION $462 $1,320 Implemented
DS0002 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $234 $1,205 Implemented